My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
09.04 - Change Order for South Oak Street
Laserfiche
>
City Council (Permanent)
>
Agenda Packets (Permanent)
>
2009
>
06-02-2009 Council Meeting
>
09.04 - Change Order for South Oak Street
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/10/2014 11:33:39 AM
Creation date
6/10/2014 11:33:04 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Change Order <br />No. 2 <br />Date of Issuance: June 3, 2009 Effective Date: June 3, 2009 <br />Project: 2009 South Oak Street Owner. City of Pequot takes Owners Contract No.: <br />Improvements <br />Contract: Street and Storm Drainage Improvements Date of Contract: <br />Contractor. DeChantal Excavating, LI-C Engineer's Project No.: 013080040 <br />The Contract Documents are modified as follows upon execution of this Change Order: <br />Description: Construct additional parking lot for City Park near project; includes clearing, grubbing, grading, aggregate base <br />and paving ($5, 283.25). Overlay South Oak Street from south end of project near Pillsbury Drive to Pequot Boulevard including <br />tack coat and aggregate shouldering ($11,699.27). Remove additional pipe culvert, fill, and grading north of project ($397.50). <br />Grinding of two stumps ($132.00). Additional 21 days to complete project due to delays by utility companies in relocating facilities. <br />Attachments: None <br />CHANGE IN CONTRACT PRICE: CHANGE IN CONTRACT TIMES: <br />Original Contract Price: Original Contract Times: ❑ Working days X Calendar days <br />Substantial completion (days or date): July 31.20Q9 <br />$ 198.940.59 Ready for final payment (days or date): August 28, 2009 <br />Increase from previously approved Change Orders [Increase] [Decrease] from previously approved Change Orders <br />No. 1 to No. 1 No. to No. <br />Substantial completion (days): NIA <br />$ 805.00 Ready for final payment (days): NIA <br />Contract Price prior to this Change Order. Contract Times prior to this Change Order. <br />Substantial completion (days or date): July 3l. 2009 <br />$ 199.745.59 Ready for final payment (days or date): August 28, 2009 <br />Increase of this Change Order increase of this Change Order. <br />Substantial completion (days or dated August 21.2009 <br />$ 17.512.02 Ready for final payment (days or date): September 18. 2009 <br />Contract Price incorporating this Change Order Contract Times with all approved Change Orders: <br />Substantial completion (days or date): August 21.2009 <br />$ 217.257.61 Ready for final payment (days or date): SerAgmber 18.2009 <br />RECOMMENDED: ACCEPTED: ACCEPTED: <br />By. 1 i 11 BY BY <br />Engineer (Autlwrized Signature) Owner (AuUarized Signature) Contractor (Authorized Signature) <br />Date: (.it l o °I Date: Date: <br />EJCDC No. C- 941(2002 Edition) Page 1 of 1 <br />Prepared by the Engineers' Joint Contract Documents Committee and endorsed by the <br />Associated General Contractors of America and the Construction Specifications Institute. 0130B0040 <br />'-N <br />"-'N, <br />
The URL can be used to link to this page
Your browser does not support the video tag.