Laserfiche WebLink
A��plicac�t tta� pr����i�ied MF'CA NNl)ES�fiI)S (rer�eral l'E�rtuil C��t����h�t���. <br /> ��() `��r��F���� <br /> 3. Topsoil berms shall be placed and vegetated in such a way as to screen the <br /> excavation area from view and to serve as a noise and dust buffer for area <br /> residences, as i���1i����t��c� ��i� attac:heci �?xhihit ��. <br /> 4. Applicant shall install fencing on all sides of the excavation area as a safety <br /> barrier, ��� i��dirate�� ��r� �tt�rhed F.xhibit 13. <br /> 5. The applicant shall furnish a bond in the amount that is acceptable to the <br /> City Engineer and the Planning Commission to serve as a guarantee that <br /> the restoration and rehabilitation requirements are met to the satisfaction <br /> of the City. <br /> h. The applicant shall submit information required in Section 8.5 "Extractive <br /> Uses and Restoration" Subparts 5 (B) (C) and (D). ('1'h�,s� are i��c�i��at�s�i ���� <br /> h;xhil�it� A �: E3 G�n�� M�E� �'} <br /> �. The applicant shall provide a detailed restoration plan meeting the <br /> requirements of Section 8.5 "Extractive Uses and Restoration" Subpart 4, <br /> as indic�at�� c�n t��;xhil�ii (�'. <br /> 8. The applicant shall provide soil boring data/ground water elevation for at <br /> least three boring sites throughout the excavation area. The boring <br /> locations shall be spaced at least lod apart. A��E�lic;a►�k fi�s }>��u��idE��� ���il <br /> bt�riii� cl�t��/�r�>u�id �����ter el��G�ti���� f��e ,�, f�>�>►•iitg site� tklrc�u�t�c�ut t�lie <br /> exc������ti«►i arca��� <br /> 9. Extraction operations shall take place between �oo �:c>c� AM and 6:00 <br /> PM, Monday through Friday. <br /> lo.The slopes surrounding the excavation area shall be graded or backfilled to <br /> contour and shape the peaks and depressions thereof, so as to produce a <br /> gently drained surface that will minimize erosion due to rainfall and which <br /> will be in substantial conformity to the adjoining land area. <br /> ii. Four (4) inches of black topsoil shall be placed on all areas. <br /> i2.Vegetation shall be restored by appropriate seeds of grasses or planting of <br /> shrubs or trees in all parts of said mining area. <br /> i3. The banks of all excavation not backfilled shall be sloped not steeper that <br /> 3:i and said bank shall require the establishment of vegetation. <br /> i4. This extractive use shall terminate 5 years from date of approval, M<�� �i, <br /> 2025. <br /> i5. Reclamation of the extractive use site shall be completed within one (1) <br /> year after the cessation of the operation. <br /> If the Planning Commission approves the Interim Use application, the Planning <br /> Commission should adopt the attached Resolution by motion also. <br /> Pequot Lakes Staff Report 3•1-15 <br /> May 2i,2020 <br />