Laserfiche WebLink
PEQUOT LAKES FIRE DEPARTMENT <br />MINUTES OF THE MAY 6, 2009 <br />The monthly meeting of the PLFD was called to order by Chief Nelson, 23 members <br />were present. The minutes of the last meeting were read and approved by a motion by <br />Wendt, second by Varilek, motion passed. <br />Truck and equipment checks will be discussed a new way tonight. Minor details will not <br />be mentioned, only important information will be discussed. All trucks and equipment <br />were Ok tonight. Tanker 2 is still in South Dakota. Tanker 3 did have an outdated fire <br />extinguisher. Daren and Jeremie filled and dated all gasoline cans tonight. <br />The financial report was next. The fire budget has a present balance of approximately <br />$105,573.00. Our checking account new balance tonight is $8269.77. During the month <br />we purchased pop for $44.02. The scholarship fund balance is $1300.65. Casanova <br />motioned to approve the report, second by Cerise, motion passed. <br />We received a thank you note from SADD for participating in the mock car accident. <br />The safety topic is to always have your turnout gear at incidents and wear it. If you do not <br />have your gear, please leave the scene. Also there is no private gear allowed at any <br />incidents we have. Safety awareness for the Hurst tool is to always check all bolts and <br />hose connections to be sure they are tight. Practice accountability when ever you can. <br />Always clean up and check all cars that we use for Hurst tool practice. Make sure they <br />are safe to be hauled away by the tow truck. Clean up all messes at the fire hall. Be on <br />time for meetings. Do not talk on the radios when personnel are inside structures during <br />incidents. There is no need for unnecessary radio chat. Look at maps before leaving the <br />hall for an incident response if you are not sure where it is. Also do not leave the fire hall <br />after a call until all work and clean up is completed. <br />The construction project for the new office needs the drywall all installed and mudded. <br />There will be a work night next Wednesday, May 13, at 6:30 pm. <br />The furnace for the new training room and office needs to have the installation <br />completed. There will be a work day for that on Saturday, May 23. <br />Tanker 2 is ready to be picked up from the factory. There is some one from the Breezy <br />Point area who may be able to fly us over there if we pay for fuel. <br />Only RIT personnel may attend RIT calls. Also we need the training topic and time for <br />each RIT meeting roll sheet. <br />Scott Warner is working on a list of basic equipment that we may need for confined space <br />incidents. <br />L <br />