My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
09.01D Rasmussen Road & South Washington Avenue Improvement Project- Construction Materials Testing Services Proposal
Laserfiche
>
City Council (Permanent)
>
Agenda Packets (Permanent)
>
2020
>
05-05-2020 City Council Meeting
>
09.01D Rasmussen Road & South Washington Avenue Improvement Project- Construction Materials Testing Services Proposal
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/30/2020 11:39:34 AM
Creation date
4/30/2020 11:39:33 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
BRAI�IN Project Proposal <br /> I NTE RTEC QT6119419 <br /> �s�,u,eYa,B,,;180„ Rasmussen Road 8 South Washington Avenue Road 8 Utility Imps <br /> Client: Work Site Address: Service Description: <br /> City of Pequot Lakes Rasmussen Road Construction Materials Testing <br /> South Washington Avenue <br /> 4638 Main Street Pequot Lakes,MN <br /> Pequot Lakes,MN 56472 <br /> 218.568.5222 , <br /> cityhall@pequotlakes-mn.gov <br /> Description Quantity Units i Unit Price Extension <br /> � _ �v rt � _���� �;� .b a�:-,���.� :,� ,�� � � � <br /> �. :_.` ,.,�;,��� ,# � <br /> Mv.� �.:,... ...w. .�� �. ,....���_s . :� : ,. . <br /> Activity 1.1 Soil Testing 56,837.00 <br /> 207 Compaction Testing-Nuclear 45.00 Hour 80.00 $3,600.00 <br /> Work Activity Detall Qty Units Hrs/Unit Extenslon <br /> Utilities,Storm,Sanitary, Water Main 8.00 Trips 4.50 36.00 <br /> Subgrade Preparation 2.00 Trips 4.50 9.00 <br /> 1308 Nuclear moisture-density meter charge,per hour 45.00 Each 24.00 i $1,080.00 <br /> 1861 CMTTripCharge 10.00 Each 120.00 $1,200.00 <br /> 1318 Moisture Density Relationship(Proctor) 3.00 Each 185.00, $555.00 <br /> 1162 Sieve Analysis with 200 wash,per sample 3.00 Each 134.00 $402.00 <br /> Activity 7.2 Concrete Testing a14,830.00 <br /> 261 Concrete Testing 85.50;Hour 80.00` $6,840.00 <br /> Work Actfvity Detail Qty Units Hrs/Unif Extension <br /> Sidewalks 6.00 Trips 4.50 27.00 <br /> Cur6&Gutter 5.00 Trips 4.50 22.50 <br /> Exterior Concrete&Driveway Aprons 6.00 Trips 4.50 27.00 <br /> Sign Bases&Misc.Items 2.00 Trips 4.50 9.00 <br /> 278 Concrete Cylinder Pick up 35.00 Hour 80.00' $2,800.00 <br /> Work Activity Detail Qty Units Hrs/Unit Extenslon <br /> Cylinder Pickup 10.00 Trips 3.50 35.00 <br /> 1861 CMT Trip Charge 29.00 Each ' 120.00 $3,480.00 <br /> 1364 Compressive strength of concrete cylinders,per specimen ' 57.00 Each 30.00 $1,710.00' <br /> Work Activ/ty Detail Qty Units Hrs/Unit Extension <br /> Sidewalks 6.00 Set 3.00 18.00 <br /> Cur6&Gutter 5.00 Set 3.00 15.00 <br /> Sign Bases&Misc.Items 2.00 Set 3.00 6.00 <br /> Exterior Concrete&Driveway Aprons 6.00 Set 3.00 18.00! <br /> Activity 1.3 Pavement Testing �1,038.00 <br /> 1530 Asphalt Content,per sample 2.00 Each : 150.00 $300.00 <br /> 1532 Extracted Aggregate Gradation,per sample 2.00 Each ' 104.00 $208.00 <br /> 1528 Rice Speciflc Gravity,per sample 2.00'Each 80.00' <br /> _ $160.00 <br /> 1568 Gyratory Gravity,per sample 2.00'Each 185.00 $370.00 <br /> Activity 1.4 Project Management 52,472.00 <br /> 226 ProjectManager 11.00'Hour 160.00 $1,760.00 <br /> 228 Senior Project Manager 1.00 Hour 180.00 $180.00 <br /> 238 Project Assistant 7.00 Hour , 76.00 $532.00 <br /> ww , <br /> � ��=".��` ���:�; <br /> �3 <br /> Proposal Total: E25,177.00 <br /> 04/23/2020 03:16 PM Page 1 of 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.