up and is now running. There are a couple bad solenoid valves I need to replace but <br /> otherwise everything is working fine. <br /> 11)PRASD operators did some sewer jetting on Oriole Street, Front Street and Sibley <br /> Street. No sewer backups were reported—this was just regular preventative <br /> maintenance. Also,the City's lift station valve vaults were inspected and isolation <br /> valves exercised. We do this once or twice a year to make sure we can isolate check <br /> valves and other wet well piping/pumps if needed. <br /> 12)A fire hydrant on Main Street was repaired on Monday, April 13�'. <br /> 13)A new telemetry unit was installed on the Industrial Park lift station and is working <br /> well. This will help PRASD operators monitor pump runtimes and notify us of high- <br /> level alarms and/or power outages during emergencies. <br /> 14)Utility locating has really picked up recently and is keeping us busy. <br /> 15)Spring hydrant flushing has been postponed due to construction. We will plan on <br /> flushing and flow testing in June or July after crews have wrapped up. <br /> 16)Thanks to an early start and favorable weather, the Rasmussen Road project has gone <br /> pretty well so far. RL Larson's crews are working ahead of schedule and they are doing <br /> quality work. A couple of the temporary water lines froze up one or two nights after <br /> first connected but the weather forecast looks like that shouldn't be an issue any more. <br /> Respectfully Submitted by: <br /> Andrew Schwartz Operations Manager, Pine River Area Sanitary District <br /> Please feel free to call my cell at 320-232-5787 with any questions/concerns <br /> For 24-hour emergency service call 218-851-9060 <br />