My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3(b) Conditional Use Permit for an Extractive Use
Laserfiche
>
Planning & Zoning
>
Agenda Packets
>
2020
>
04-16-2020 Planning & Zoning Commission Meeting
>
3(b) Conditional Use Permit for an Extractive Use
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/8/2020 3:42:35 PM
Creation date
4/8/2020 3:42:28 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
38
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
horizontal to one (1) foot vertical and said bank shall require the <br /> establishment of vegetation. <br /> D. Reclamation of extractive use sites and designated haul roads shall <br /> be completed within one (1) year after the cessation of the <br /> operation, unless modified by the CUP. <br /> 5. Application, contents, procedure. An application for such operation shall <br /> provide the following information in addition to that required by the CUP process: <br /> A. Name of the person or corporation conducting the actual removal <br /> operation. <br /> B. Certificate of Survey labeled Map A indicating pre-mining <br /> conditions as they currently exist in the project area including all <br /> areas within 500 feet of the site at a scale of not less than one (1) <br /> inch equals one hundred (100) feet that includes the following: <br /> • Description and location of existing vegetation within and <br /> adj acent to the proj ect area; <br /> • Location of all structures within and adjacent to the project <br /> area and the purpose for which each structure is used, <br /> including buildings, pipelines, cables, railroads and power <br /> lines; <br /> • Existing drainage patterns, wetlands and permanent water <br /> areas; <br /> • Contours within the project area at five (5) foot intervals. <br /> C. Map B outlining size of the area from which the removal is to be <br /> made and the volume of material to be removed. <br /> D. Map C depicting proposed final grade with maximum five (5) foot <br /> contour intervals after deposit is removed and area restored. <br /> E. Type of resources or materials to be removed. <br /> F. Proposed method of removal and whether or not blasting or other <br /> use of explosives will be required. <br /> G. Description of equipment to be used, including any proposed <br /> accessory uses such as hot mix plants or crushing operations. <br /> H. Method of rehabilitation and reclamation of the pit area, including <br /> timeframe for rehabilitation. <br /> I. Identification of haul roads and amount of truck activity at highest <br /> Pequot Lakes Staff Report 3(a)-� <br /> April i6,2020 <br />
The URL can be used to link to this page
Your browser does not support the video tag.