Laserfiche WebLink
Section 17-8.5 EXTRACTIVE USES AND RESTORATION <br /> 1. In all districts where permitted, as defined in 17-6.4 Extractive Use <br /> Overlay District, mining shall be permitted only by CUP. Such permit shall <br /> include as a condition: a site plan, a completion plan and a haul route plan with <br /> provision for road restoration as provided below. An approved extractive use CUP <br /> shall be used solely for the operations detailed in the permit. <br /> 2. All excavation and extraction shall conform to the following: <br /> A. Distance from propert ly ines. No quarrying operation shall be <br /> carried on or any stock pile placed closer than 50 feet from any <br /> property line, unless a greater distance is specified by the CUP <br /> where such is deemed necessary for the protection of adjacent <br /> property. This distance requirement may be reduced to 25 feet only <br /> with written consent of the owners of the affected adjacent non- <br /> residence property. Proof of said agreement shall be submitted as a <br /> part of the application and maintained in City files for all approved <br /> CUPs for extractive uses. Without such agreement, the buffer area <br /> may be used only under the following circumstances: <br /> (1) The buffer area may contain the haul road if the City <br /> determines that, for safety purposes, the access to the use is <br /> best served in that area. <br /> (2) The haul road may be located in the buffer area to avoid <br /> wetlands or other sensitive environmental resources. <br /> (3) If authorized in an approved reclamation plan, one half of <br /> the buffer area may be used for the storage of topsoil and <br /> for final sloping. All topsoil storage areas shall be seeded to <br /> prevent erosion and dust. Berms, including those consisting <br /> of topsoil to be used for reclamation, may be placed in the <br /> buffer area, but they shall be seeded and mulched in a <br /> manner that prevents dust from blowing onto adjacent <br /> properties. <br /> B. Distance from public ri t of way. In the event that the site of the <br /> mining or quarrying operation is adjacent to the right of way of any <br /> public street or road, no part of such operation shall take place <br /> closer than 50 feet to the nearest line of such right of way. <br /> C. Fencin . Fencing shall be erected and maintained around the entire <br /> site or excavated portions thereof and shall be of a type specified in <br /> the CUP. <br /> Pequot Lakes Staff Report 3�a)-4 <br /> April i6,2020 <br />