My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4(c) Splash Pad Discussion and Research
Laserfiche
>
Parks
>
Agenda Packets
>
2020
>
03-17-2020 Park Commission Meeting
>
4(c) Splash Pad Discussion and Research
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/13/2020 10:19:37 AM
Creation date
3/13/2020 10:19:36 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SPLASHPAD DISCUSSION AND RESEARCH <br /> Estimated Costs for Initial Construction: <br /> $128,500 CFS Bid for Splashpad project(Products as noted on Contract dated <br /> 1.24.2020, Installation, Concrete, &all details included in their packet) <br /> $20,000 Water Line(3—4"to accommodate nearby service needs such as <br /> Bathroom, Splashpad, Fountain(s), etc.) <br /> o Approximately 400'of line from main >needs to be w/in 50' <br /> o Numbers based on engineer provided rough estimates($50/ft) <br /> $6,250 Stormwater Line (12"Concrete from West) <br /> o Approximately 125'total>needs to be w/in 50' <br /> o Numbers based on engineer provided rough estimates($50/ft) <br /> $2,000 Stormwater intake structure <br /> $2,000 Power>local contractor estimated IF the nearby panel provided <br /> adequate amount of power,they could trench in and provide onsite for <br /> this rough estimate <br /> $1,500 Water Meter <br /> $2,000 Irrigation repair and modification around pad <br /> $6,000 Walking Path Adjustment(A.B.estimates$3/ft2) <br /> $500 Black Dirt/Reseeding <br /> $5,000 Engineering—per WSN proposal <br /> $173,750 Total Estimated Costs for Initial Splashpad Construction <br /> Additional Related Costs: <br /> $10,000+ Cleaning out of Stormwater Discharge Area (N of Lumberyard) <br /> o Rough estimate to be refined once the Local Excavator can <br /> access and accurately assess area in question <br /> o A combination of sediment buildup and trees in the water <br /> discharge storage area already causes a noticeable surcharge <br /> that causes deep puddles at Main and Patriot during large <br /> runoff and storm events <br /> o This was previously discussed as a definite need prior to the <br /> Road Turn backs I was informed, but not completed <br /> o I'd consider it must be addressed prior to inserting another <br /> 33,000+gallons a day during prime Thunderstorm Season <br /> $2,000+ installation Fence extension (125' south from existing playground fence) <br /> $30,000+ Park Bathroom <br /> o One good idea is they have Splashpad Controls all housed inside <br /> the structure's utility room <br /> • See if possible <br /> ■ Would protect and reduce vandalism <br /> $1,100 Water Fountain <br /> o Chamber fountain estimate <br /> $30,000 Parking Lot Modification and Paving(� 100' X 100' @ $3/ft2) <br />
The URL can be used to link to this page
Your browser does not support the video tag.