Laserfiche WebLink
SPLASHPAD DISCUSSION AND RESEARCH <br /> Estimated Costs for Initial Construction: <br /> $128,500 CFS Bid for Splashpad project(Products as noted on Contract dated <br /> 1.24.2020, Installation, Concrete, &all details included in their packet) <br /> $20,000 Water Line(3—4"to accommodate nearby service needs such as <br /> Bathroom, Splashpad, Fountain(s), etc.) <br /> o Approximately 400'of line from main >needs to be w/in 50' <br /> o Numbers based on engineer provided rough estimates($50/ft) <br /> $6,250 Stormwater Line (12"Concrete from West) <br /> o Approximately 125'total>needs to be w/in 50' <br /> o Numbers based on engineer provided rough estimates($50/ft) <br /> $2,000 Stormwater intake structure <br /> $2,000 Power>local contractor estimated IF the nearby panel provided <br /> adequate amount of power,they could trench in and provide onsite for <br /> this rough estimate <br /> $1,500 Water Meter <br /> $2,000 Irrigation repair and modification around pad <br /> $6,000 Walking Path Adjustment(A.B.estimates$3/ft2) <br /> $500 Black Dirt/Reseeding <br /> $5,000 Engineering—per WSN proposal <br /> $173,750 Total Estimated Costs for Initial Splashpad Construction <br /> Additional Related Costs: <br /> $10,000+ Cleaning out of Stormwater Discharge Area (N of Lumberyard) <br /> o Rough estimate to be refined once the Local Excavator can <br /> access and accurately assess area in question <br /> o A combination of sediment buildup and trees in the water <br /> discharge storage area already causes a noticeable surcharge <br /> that causes deep puddles at Main and Patriot during large <br /> runoff and storm events <br /> o This was previously discussed as a definite need prior to the <br /> Road Turn backs I was informed, but not completed <br /> o I'd consider it must be addressed prior to inserting another <br /> 33,000+gallons a day during prime Thunderstorm Season <br /> $2,000+ installation Fence extension (125' south from existing playground fence) <br /> $30,000+ Park Bathroom <br /> o One good idea is they have Splashpad Controls all housed inside <br /> the structure's utility room <br /> • See if possible <br /> ■ Would protect and reduce vandalism <br /> $1,100 Water Fountain <br /> o Chamber fountain estimate <br /> $30,000 Parking Lot Modification and Paving(� 100' X 100' @ $3/ft2) <br />