My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4(a) Commercial Recreation Specialists
Laserfiche
>
Parks
>
Agenda Packets
>
2020
>
03-17-2020 Park Commission Meeting
>
4(a) Commercial Recreation Specialists
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/13/2020 9:56:20 AM
Creation date
3/13/2020 9:56:16 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
` COMMER(IAL RE{REATION SPECIALISTS <br /> � <br /> January 29,2020 <br /> Nancy Malecha <br /> City of Pequot Lakes <br /> 4638 Main Street <br /> Pequot Lakes,MN 56472 <br /> RE:Trailside Park Splashpad Design/Build Proposal <br /> The Commercial Recreation Specialists(CRS)Team is pleased to present this proposal,$128,500.00 for a turnkey <br /> Splashpad Installation at Trailside Park in Pequot Lakes,MN. We are excited to share our many years of <br /> experience in the commercial recreation market to assist you in creating what we feel will be a very exciting and <br /> dynamic project. <br /> Scope of Work Ref#SW20190611-JC <br /> Complete Product&Installation of a Commercial Splashpad to include the following: <br /> • Installation of Vortex Water Features&Smartpoint Manifold Water Distribution System: <br /> o Includes Delivery of all Products as Noted on Splashpad Concept dated 1-24-20. <br /> o Artist Renderings,Spray Zone Layout&Piping&Electrical Schematics. <br /> o MN DOH Permit/Plan Review with Site Inspection Prior to Start-Up.Permit fee included. <br /> • Installation and Concrete to Include: <br /> o Installation to be Performed by an Experienced Vortex Installer. <br /> o Concrete Subbase to be 6"Compacted Class 5. <br /> o Concrete to be 6"thick,#4 Rebar Reinforced, 12"O.C., Medium Broom Finish. <br /> o Total Concrete Supplied:2,123 sq.f[.(wet and dry zones combined)for Splashpad. <br /> o Standard Grey Concrete mix. <br /> o Installation of Smartpoint Manifold Command Center/Drain System,BFP,Pressure Regulator, <br /> Piping(to Include Schedule 80 PVC�,Valves,loints&Connections,Setting of Water Feature <br /> Foundations&Embeds&Installation of Vertical Water Features. <br /> o Backflow preventer(RPZ)to be installed by Licensed Plumber hired by CRS.Product included in <br /> Splashpad Equipment and to be installed in nearby irrigation cabinet.Irrigation cabinet to be <br /> supplied and installed by CRS. <br /> o Electrical work to include power(120V)from a nearby subpanel to Smartpoint Manifold Power <br /> Supply and Timer.All wiring to Controller in Center of Drain&Bonding of all Water Features and <br /> Concrete Rebar.CRS to hire local Licensed Electrician.Includes Electrical Permit and Inspection <br /> prior to Concrete Pour. <br /> - , }M <br /> � � � CORPORATE 80]Liberry Dr,Suite 201,Verona WI 53593 I b08-848-8181 faz 608-848 8182 <br /> �54Re�•�m <br />
The URL can be used to link to this page
Your browser does not support the video tag.