My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6(b) Main Street Gateway
Laserfiche
>
Planning & Zoning
>
Agenda Packets
>
2020
>
04-02-2020 Planning & Zoning Commission Meeting
>
6(b) Main Street Gateway
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/13/2020 9:19:49 AM
Creation date
3/13/2020 9:19:48 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
It is important to remember the primary function of Main Street from the <br /> roundabout to Rasmussen Road is to provide a framework for capturing value <br /> from the local land use pattern. The primary function is not moving traffic at <br /> speed. <br /> "Wish List" Items <br /> i. Bike/Multi Use Trail <br /> 2. Street design scaled to adjacent land use/ADT(Don't over build) <br /> 3. Sidewalks/Crosswalks <br /> 4. Parking <br /> 5. Bury Utility Lines <br /> 6. Lighting <br /> �. Median <br /> 8. Curb/Gutter <br /> 9. Landscaping <br /> io.Truck Traffic <br /> Pequot Lakes Staff Report 6(b)-2 <br /> March i9,2020 <br />
The URL can be used to link to this page
Your browser does not support the video tag.