My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
09.01 - Water/Wastewater Monthly Report
Laserfiche
>
City Council (Permanent)
>
Agenda Packets (Permanent)
>
2009
>
05-05-2009 Council Meeting
>
09.01 - Water/Wastewater Monthly Report
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/10/2014 9:47:31 AM
Creation date
6/10/2014 9:46:54 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
`, <br />09 <br />Wastewater Dept. <br />I. Facility Performance: <br />a. CBOD Concentration <br />Influent — mg/I (Design — 250 mg/1) <br />Effluent — mg/I <br />b. TSS Concentration <br />Influent — mg/1 (No Design Listed) <br />Effluent — mg/1 <br />c. Effluent Fecal Coliform Geometric Mean — organisms /100 ml <br />Permit Condition — 200 organims /100 ml <br />d. Flow - Average Daily Flow — 55,624 gallons (Design — 121,795 gal/day) <br />Maximum Daily Flow — 77,418 gallons <br />Minimum Daily Flow — 40,986 gallons <br />Total Monthly Flow — 1,557,468 gallons (as of the 28h) <br />II. Operations and Maintenance: <br />• The monthly MPCA Discharge Monitoring Report was completed and submitted as <br />required. <br />• April 8b, I attended a wastewater class in Taylors Falls, sponsored by MRWA <br />• April 9h, Lance and I flushed several problem -area sewer lines with tanker <br />• Throughout the month of April, we've been collecting wastewater samples from our <br />secondary pond to closely monitor our fecal counts. They've been quite high, but with <br />the warmer weather now, they should get better. We are irrigating as often as we can to <br />get our pond levels down so we can repair the other air lines, as well as ensure that we <br />will have enough storage for the upcoming winter. <br />• April 23`a, Kent with NorthStar Pump pulled one of our irrigation pumps to take it in for <br />repairs. <br />• April 25`", Greg and Mike jetted over by the Cole Bldg. The manhole in front of <br />Thurlow's was backing up when Greg did the daily checks. No problems occurred. <br />• April 28th, MN Power located the broken electrical wire to our west irrigator. Kurt and <br />Lance dug down to it with the backhoe and had Karl Moon repair it. We just need to get <br />the water - pressure valve replaced and then it will be ready to operate. Steve with <br />Northern Irrigation will be coming soon to take care of it. <br />Report Submitted By: Tina Nolden (Water/Wastewater Operator) <br />Please call me if you have any questions /comments. <br />218 -568 -5604 or 218- 820 -2125 <br />
The URL can be used to link to this page
Your browser does not support the video tag.