My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
04-14-2009 Municipal Consent
Laserfiche
>
City Council (Permanent)
>
Agenda Packets (Permanent)
>
2009
>
04-14-2009 Special Council Meeting
>
04-14-2009 Municipal Consent
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/16/2014 3:42:26 PM
Creation date
5/21/2014 11:18:15 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
MINNESOTA STATUTES 2008 161.164 <br />161.164 FINAL LAYOUT APPROVAL PROCESS. <br />Subdivision 1. Submission of final layout. Before proceeding with the construction, <br />reconstruction, or improvement of any route on the trunk highway system lying within any <br />municipality, the commissioner shall submit to its governing body a final layout and project <br />report covering the purpose, route location, and proposed design of the highway. The final layout <br />must be submitted as part of a report containing any supporting data that the commissioner <br />deems helpful to the governing body in reviewing the final layout submitted. The supporting <br />data must include a good faith cost estimate of all the costs in which the governing body is <br />expected to participate. The final layout must be submitted before final decisions are reached so <br />that meaningful early input can be obtained from the municipality. <br />Subd. 2. Governing body action. (a) Within 15 days of receiving a final layout from the <br />commissioner, the governing body shall schedule a public hearing on the final layout. The <br />governing body shall, within 60 days of receiving a final layout from the commissioner, conduct a <br />public hearing at which the Department of Transportation shall present the final layout for the <br />project. The governing body shall give at least 30 days' notice of the public hearing. <br />(b) Within 90 days from the date of the public hearing, the governing body shall approve or <br />disapprove the final layout in writing, as follows: <br />(1) If the governing body approves the final layout or does not disapprove the final layout in <br />writing within 90 days, in which case the final layout is deemed to be approved, the commissioner <br />may continue the project development. <br />(2) If the final construction plans contain changes in access, traffic capacity, or acquisition of <br />permanent right -of -way from the final layout approved by the governing body, the commissioner <br />shall resubmit the portion of the final construction plans where changes were made to the <br />governing body. The governing body must approve or disapprove the changes, in writing, within <br />60 days from the date the commissioner submits them. <br />(3) If the governing body disapproves the final layout, the commissioner may make <br />modifications requested by the municipality, decide not to proceed with the project, or refer the <br />final layout to an appeal board. The appeal board shall consist of one member appointed by the <br />commissioner, one member appointed by the governing body, and a third member agreed upon <br />by both the commissioner and the governing body. If the commissioner and the governing body <br />cannot agree upon the third member, the chief justice of the Supreme Court shall appoint a third <br />member within 14 days of the request of the commissioner to appoint the third member. <br />Subd. 3. Appeal board. Within 30 days after referral of the final layout, the appeal board <br />shall hold a hearing at which the commissioner and the governing body may present the case for <br />Copyright 0 2008 by the Revisor of Statutes, State of Minnesota. All Rights Reserved. <br />
The URL can be used to link to this page
Your browser does not support the video tag.