My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
04-14-2009 Municipal Consent
Laserfiche
>
City Council (Permanent)
>
Agenda Packets (Permanent)
>
2009
>
04-14-2009 Special Council Meeting
>
04-14-2009 Municipal Consent
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/16/2014 3:42:26 PM
Creation date
5/21/2014 11:18:15 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Municipal Consent <br />HPDP / Scoping / Subject Guidance Mn /DOT <br />Also, maintenance activities do not trigger the need for municipal consent. <br />Examples <br />Permanent Easements (such as Drainage Easements) require municipal consent <br />(because they take permanent right -of -way). <br />Roundabouts are used for traffic regulation and as a safety measure, and thus are <br />exceptions that do not require Municipal Consent even if they involve permanent <br />right -of -way taking. <br />Roles and Procedures <br />Municipal consent should only be requested from a city if it is required. (See Threshold Criteria <br />above). <br />.-�\ <br />Sometimes a city may choose to waive municipal consent on a specific project. In that case the city <br />council must pass a resolution clearly identifying the project and waiving its right to municipal <br />consent for that project. However, the typical municipal consent process is as outlined below. <br />Procedure (for obtaining municipal consent) <br />1. Mn /DOT (District) submits to the city the final layout with a letter requesting city <br />approval. The letter includes a good faith cost estimate of the city's share of the <br />project's cost and the following (either in the letter or in an attached report): <br />• project purpose <br />• route location <br />• short description of the proposed design of the highway <br />• any additional supporting data <br />2. City schedules and holds public hearing (within 60 days of submittal). <br />City must schedule within 15 days of receiving Mn /DOT's request for approval and <br />must give 30 days public notice. <br />3. City passes resolution approving / disapproving (within 90 days of public hearing). <br />After 90 from the date of the public hearing, if the city has not passed a resolution <br />disapproving the layout, the layout is deemed approved. <br />2of5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.