My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
09.02 North Sluetter Road Feasibility Report
Laserfiche
>
City Council (Permanent)
>
Agenda Packets (Permanent)
>
2020
>
02-04-2020 City Council Meeting
>
09.02 North Sluetter Road Feasibility Report
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/5/2020 3:30:08 PM
Creation date
1/30/2020 1:11:18 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
41
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
,..: �,`�� „ �. � "� <br /> .:�� '�;� � ►'"� w � _ <br /> . � �:,r�. _ <br /> �`� °' "�w�r �F..k,� M�°+ ��., <br /> -�, <br /> . �.,'!°� <br /> t ��; �"r �rtic'�� � <br /> ,r�`"�.�, '�, ..�"+�, • <br /> � � 'z�m ��`a'� � �����_� <br /> ���.�, � � <br /> .,, fr-�-. �r � .. .•�'#P 4ti•'�. <br /> R <br /> �� . <br /> _ -. . . . �� .- "�rL.��'�#.. . A <br /> _ _ <br /> ,.. '.F'.gys^t•.'. �y,s _. <br /> -' � ���_3 �y.� ,�. <br /> �' <br /> #� <br /> � -- .�- '��-. <br /> tie- � _ ,. � . <br /> x� <br /> �� _'. <br /> ��`` � <br /> Other items that were noted during the review and study: <br /> • There are power poles placed 5-10 feet from the edge of the pavement in some locations. <br /> • Initial observations are that utility relocation does not appear to be necessary based on <br /> locations of aboveground utility poles and pedestals; however, underground utilities <br /> could exist beneath the traveled way. <br /> • No soil borings were completed for this study. The soil survey for this area indicates <br /> soils consist of 1-2 feet of loamy sands (96% of the project length) and Markey Muck <br /> (4% of the project length). A copy of the Soil Survey Map is included in the Appendix. <br /> • Existing driveway approaches consist of both bituminous pavement and gravel. <br /> • Based on MNTOPO website contours, we anticipate there are 3 or 4 culverts that could <br /> possibly need to be replaced or installed. <br /> • Traffic count data has not been obtained for North Sluetter Road. The majority of traffic <br /> use is anticipated to come from passenger vehicles and residential-type service vehicles. <br /> However, it is anticipated traffic loading will also come from garbage trucks, school <br /> buses, logging trucks, and construction vehicles during house remodel-additions-new <br /> construction. <br /> 7 <br /> 2019-13331 —City of Pequot Lakes-Proposed North Sluetter Road Improvements <br />
The URL can be used to link to this page
Your browser does not support the video tag.