Laserfiche WebLink
- Help remove snow and provide access as needed for Water and Wastewater Infrastructure(WTP, <br /> WWTF Ponds, WW Liftstations, Fire Hydrants) <br /> Compiled and submitted by Pequot Lakes Public Works Director—Jason Gorr <br /> Please direct questions to: (612)810-9478 or jgorrn,pequotlakes-mn.gov <br /> Water Dept. <br /> Facility Performance for December 2019: <br /> Flow <br /> Average daily gallons pumped: 81,000 gallons <br /> Maximum daily gallons pumped: 125,000 gallons <br /> Minimum daily gallons pumped: 35,000 gallons <br /> Total monthly gallons pumped: 2,437,000 gallons <br /> Lab <br /> Average daily chlorine concentration: 0.43 (mg/1) <br /> *Recommended chlorine concentration: 0.2 to 0.5 mg/1 <br /> Average daily fluoride concentration: 0.7 (mg/1) <br /> *Recommended fluoride concentration: 0.5 mg/1 to 0.9 mg/1 <br /> Wastewater Dept. <br /> Facility Performance for December 2019: <br /> Flow <br /> Average Daily Flow: 57,672 gallons (Design— 121,795 gaUday) <br /> Maximum Daily Flow: 64,995 gallons <br /> Minimum Daily Flow: 46,626 gallons <br /> Total Monthly Flow: 1,787,837 gallons <br /> Operations Report <br /> 1) Water treatment facility inspections were completed daily. <br /> 2) Wastewater facility and lift station checks were done every Monday, Wednesday, and <br /> Friday. <br /> 3) Monthly lift station maintenance (check amps, clean floats, inspect wet well, etc)was <br /> completed on 1/13. <br /> 4) Weekly water testing was completed. <br /> 5) Water meters were read on 1/23. <br /> 6) Monthly fluoride report was submitted to Minnesota Department of Health on 1/6. <br /> '� Monthly Discharge Monitoring Report for the WWTP was submitted to MPCA on 1/6. <br /> 8) The City's Annual Water Use Report was submitted to MNDNR on 1/8. The Annual <br /> Water Conservation Report was completed on 1/9. <br /> 9) A fire hydrant at the intersection of Sibley and Honeysuckle Streets was repaired with <br /> the help of Minnesota Rural Water Association on 1/9. <br /> 10)MN Pumpworks made repairs to the Sibley Street and Isabelle Drive lift stations on <br /> 1/13 and 1/14. A new controller was installed and base elbows replaced at the Isabelle <br /> station and check valves were replaced w/some additional pipe work at the Sibley <br /> station. Blakeman Pumping assisted with keeping the gravity sewers pumped while <br /> repairs were made. <br /> Respectfully Submitted by: <br /> Andrew Schwartz Operations Manager, Pine River Area Sanitary District <br /> Please feel free to call my cell at 320-232-5787 with any questions/concerns <br /> For 24-hour emergency service ca11218-851-9060 <br />