My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
09.01 Engineering Services for 2020
Laserfiche
>
City Council (Permanent)
>
Agenda Packets (Permanent)
>
2020
>
01-07-2020 City Council Meeting
>
09.01 Engineering Services for 2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/2/2020 12:19:16 PM
Creation date
1/2/2020 12:19:15 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
WIDSETH <br /> M EMO , NO T NG <br /> ti�.��,���d �i.,.���� <br /> 7804 Industrial Park Road <br /> PO Box 2720 <br /> To: Nancy Malecha, City Administrator Baxter,MN 56425-2720 <br /> 218.829 5117 0 <br /> From: Tim Houle 2188292517 a <br /> Bramerd@wsn.us com � <br /> Date: December 30, 2019 WidsethSmithNoltingcom <br /> Subject: Budget Status of 2019 Projects <br /> Nancy, <br /> As we have done in years past, following is a table on the above Subject. <br /> Project Name...WWTF Row Irrigation Construction Phase <br /> WSN Project....2019-10141 <br /> Contract...........Estimated $82,000 (estimated due to unknowns during construction) <br /> WSN Effort.......$67,750 <br /> WSN Billed ......$64,920 <br /> Comments.......This is the last year of a multi-year project (i.e. not all of these monies were spent <br /> in 2019). <br /> Earlier in the year, we submitted the Final OS�M Manual. <br /> We were under budget due in part to a fairly good Construction Contractor. <br /> Our Billed was less than our Effort because of a credit we provided the City due to <br /> an omission on our part. <br /> Project Name...Maintenance Facility Design and Construction Phase <br /> WSN Project....2019-10144 <br /> Contract...........Estimated $73,400 (estimated due to unknowns during construction) <br /> WSN Effort.......$113,070 <br /> WSN Billed ......$85,200 <br /> Comments .......With design and construction, this was a multi-year project (i.e. not all of these <br /> monies were spent in 2019). <br /> We were over budget because of a challenging Contractor and extended time <br /> frame. <br /> Our Effort was much more than our billed because we spent a lot of time working <br /> with the Contractor in attempts to get the project completed (and we did not write <br /> our construction phase services portion of our Contract with the City in such a way <br /> that we thought we could bill for this time—we will be changing our wording on <br /> future construction phase services). <br /> It should be noted that staff has taken on some of the tasks in trying to close out <br /> the Contract. <br /> Unfortunately, there is still some re-seeding work in the spring of 2020. <br /> In�zinrcrms �i�hitc�tu�� Sunc�ine t.nvr��nmcnt.il <br />
The URL can be used to link to this page
Your browser does not support the video tag.