Laserfiche WebLink
MINUTES <br /> PEQUOT LAKES PLANNING COMMISSION/ <br /> BOARD OF ADJUSTMENT <br /> REGULAR MEETING <br /> OCTOBER 1�, 20�9 <br /> PRESENT: Andrew Birch, Mark Hallan, Laura Larson, Nathan Norton,Tom Paulbeck, <br /> Christopher Savino, and Wesley Wilson. ABSENT: None. <br /> CITY PLANNER: Absent <br /> ZONING SPECIALIST: Dawn Bittner <br /> COUNCIL LIAISON: Scott Pederson (Absent) <br /> The meeting was called to order by Chair Hallan at 6:0o PM. <br /> A motion was made by Planning Commission Member Wilson, seconded by <br /> Planning Commission Member Birch, to open the Public Hearings. All <br /> members voted "aye". Motion carried. <br /> PUBLIC HEARINGS: <br /> APPLICANT: Alan J. Brown <br /> Applicant requests a Variance (Continuation) <br /> Bittner explained the Staff Report included in the packet was the same as the September <br /> Staff Report. Applicant was present. Bittner explained a Stormwater Site Management <br /> Plan had been received. She noted there is an area on the plan indicating an area on the <br /> neighboring lot to the south to be shaped to tie into the i22o contour to protect property <br /> from stormwater runoff. Joseph Dubel, an engineer with WSN hired by applicant, <br /> explained the new site plan. He explained it was applicant's intent to not increase <br /> stormwater from his site to his neighbor's lot. The pond isn't a retention pond,but an <br /> area to slow runoff. Mr. Dubel further explained that the intent is to create a larger <br /> contour to capture some of the stormwater from the roadway and keep it away from the <br /> neighbor's SSTS. When he asked if the neighbor had granted permission for the work, <br /> Dave Morris,the neighbor, stated affirmatively,but inquired who is responsible for the <br /> expenses incurred. Mr. Dubel stated it would be the owner, Mr. Brown, as he is creating <br /> increases to the existing stormwater issues by increasing the square footage of his cabin. <br /> When asked by Mr. Morris, Mr. Dubel stated they plan to work around the existing trees <br /> along the lot line. Mr. Morris stated his goal is not to have all the stormwater go to Mr. <br /> Brown's lot; there has always been stormwater in that area of his lot and he is <br /> MINUTES 1 <br /> Pequot Lakes Planning Commission <br /> October ��, 20�9 <br />