My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
8 Approval of October 17, 2019 Planning Commission Meeting Minutes
Laserfiche
>
Planning & Zoning
>
Agenda Packets
>
2019
>
11-21-2019 Planning & Zoning Commission Meeting
>
8 Approval of October 17, 2019 Planning Commission Meeting Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/14/2019 3:27:02 PM
Creation date
11/14/2019 3:26:59 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
5. Before the foundation for the dwelling is constructed the applicant shall submit <br /> certification by a licensed land surveyor verifying the fill meets the minimum <br /> elevation requirements of this variance approval. <br /> 6. After the dwelling is constructed the applicant shall submit certification from a <br /> professional land survey verifying the finished fill and building elevations were <br /> accomplished in compliance with the conditions of this variance approval and the <br /> standards of the Floodplain Management Overlay District. <br /> �. Gutters shall be installed on the north and south sides of the dwelling. Stormwater <br /> shall be directed to the stormwater retention area along the south edge of subject <br /> property identified on the Stormwater Site Management Plan dated October i1, <br /> 2olg as"proposed grade = i2i9.o". <br /> 8. Final grading shall meet the elevations outlined on the Stormwater Site <br /> Management Plan dated October ii, 2oi9. <br /> Planning Commission Member Norton inquired how much time the applicant had to act <br /> on the Variance approval before the approval is void. Bittner stated the applicant will <br /> receive a letter indicating the approval and the timeframe is included in the letter. <br /> All members voted "aye". Motion carried. <br /> APPLICANr: Jason Forrest <br /> Applicant requests a Variance <br /> Bittner explained the Staff Report. Applicant was present and represented by Kevin <br /> Yeager. <br /> Chair Hallan asked why the driveway was not included in the existing impervious <br /> coverage calculations. Staff indicated the surveyor did not include them. Chair Hallan <br /> pointed out the entire bluff area is included in the impervious coverage calculations of <br /> io.5 for the proposed construction, which is a misleading calculation. Chair Hallan <br /> stated a more realistic calculation would be approximately 20%south of Walleye Bay. <br /> Mr.Yeager stated the applicant has a similar issue as the previous applicant regarding <br /> on-grade slab construction and the methodology. They plan to build up the site in the <br /> area that does not reach floodplain height with a monolithic slab to maintain the <br /> elevation required. The buildable envelope is very small and they plan to get the water <br /> to the retention area sub-terrain via the gutters and underground piping so they don't <br /> have to add so much fill. <br /> Chair Hallan pointed out the finished floor elevation of i2oo.o which is more than a foot <br /> above the regulatory flood elevation. Mr.Yeager pointed out with the monolithic slab <br /> they are required to be 6 inches above the base elevation, so they will essentially be 18 <br /> inches. <br /> MINUTES 5 <br /> Pequot Lakes Planning Commission <br /> October ��, 2oi9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.