My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
12.01 - Engineering Services Proposal for S Oak St Improve
Laserfiche
>
City Council (Permanent)
>
Agenda Packets (Permanent)
>
2009
>
02-03-2009 Council Meeting
>
12.01 - Engineering Services Proposal for S Oak St Improve
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/16/2014 1:06:26 PM
Creation date
5/21/2014 9:23:02 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
February 3, 2009 Page 2 of 3 <br /> Pequot Lakes <br /> South Oak Street Proposal <br /> West Lake Street to Miller Street <br /> II. Final Design, Construction Documents, & Bidding <br /> In conjunction with the segment to the south, prepare final plans and <br /> specifications. <br /> Prepare Minnesota Pollution Control Agency (MPCA) National Pollutant <br /> Discharge Elimination System (NPDES) General Stormwater Permit as <br /> well as the Stormwater Pollution Prevention Plan (SWPPP). The City is to <br /> pay any permit fees. <br /> $8,000 <br /> Finalize plans and specifications based on City reviews. <br /> We will prepare an Advertisement for Bids and submit to the Construction <br /> Bulletin, the Pequot Lakes Echo, and the Brainerd Daily Dispatch. City is <br /> to pay any advertisement costs. <br /> We will issue Contract Documents to bidders, address bidders' questions, <br /> issue addenda as required, attend the bid opening, and prepare a <br /> tabulation of bids and a recommendation of award. <br /> III. Construction Phase <br /> We will provide for construction staking, periodic site visits, and <br /> miscellaneous construction contract administration coordination. <br /> Please note that our effort is based on the City handling the day-to-day <br /> aspects of the construction. <br /> We will provide a post-construction topographic survey and conformed to $10,100 <br /> construction drawings. <br /> Our effort is based on this project being coordinated with the project <br /> segment to the south. If it is not, our effort should be doubled. <br /> Please note that our cost for this phase can vary significantly due to the <br /> construction contactor's means and methods, by weather, and by other <br /> factors beyond our control. <br /> Total: Estimated $21,400 <br /> MAProposals\2009 Proposals\Letter Proposals\Pequot Lakes-S Oak St next to School-20090203.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.