My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
09 Public Works Report
Laserfiche
>
City Council (Permanent)
>
Agenda Packets (Permanent)
>
2019
>
10-01-2019 City Council Meeting
>
09 Public Works Report
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/25/2019 2:17:35 PM
Creation date
9/25/2019 2:17:34 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
- Flags maintained as directed <br /> - Council meeting&prep <br /> -Team Leadership Meeting <br /> - Budget work and meetings <br /> - Maintain grounds at the WTP &WWT Ponds <br /> Compiled and submitted by Jason Gorr—Pequot Lakes Public Works Director <br /> Please direct questions to: (612)810-9478 or jgorr@pequotlakes-mn.gov <br /> Water Dept. <br /> Facility Performance for August 2019: <br /> Flow <br /> Average daily gallons pumped: 114,000 gallons <br /> Maximum daily gallons pumped: 146,000 gallons <br /> Minimum daily gallons pumped: 80,000 gallons <br /> Total monthly gallons pumped: 3,405,000 gallons <br /> Lab <br /> Average daily chlorine concentration: 0.32 (mg/1) <br /> *Recommended chlorine concentration: 0.2 to 0.5 mg/1 <br /> Average daily fluoride concentration: 0.52 (mg/1) <br /> *Recommended fluoride concentration: 0.5 mg/1 to 0.9 mg/1 <br /> Wastewater Dept. <br /> Facility Performance for Au�ust 2019: <br /> Flow <br /> Average Daily Flow: 61,444 gallons (Design— 121,795 gaUday) <br /> Maximum Daily Flow: 67,309 gallons <br /> Minimum Daily Flow: 53,041 gallons <br /> Total Monthly Flow: 1,904,762 gallons <br /> Operations ReAort <br /> 1) Water treatment facility inspections were completed daily. <br /> 2) Wastewater facility and lift station checks were done every Monday, Wednesday, and <br /> Friday. <br /> 3) Monthly lift station maintenance (check amps, clean floats, inspect wet well, etc) was <br /> completed on 9/18. <br /> 4) Weekly water testing was completed. <br /> 5) Water meters were read on 9/23. <br /> 6) Monthly fluoride report was submitted to Minnesota Deparhnent of Health on 9/3. <br /> 7) Monthly Discharge Monitoring Report for the WWTP was submitted to MPCA on 9/12. <br /> 8) Quarterly Discharge Monitoring Report for the WTP was submitted to MPCA on 9/13. <br /> 9) Water filter backwash solids were pumped to the WTP reclaim basin on 9/13. <br /> 10)Jake Freeman flushed, oiled, and flagged hydrants on Thursday, September 19tn <br /> 11)We should be done irrigating the City's treated wastewater by the time of the Council <br /> meeting. The system will be drained for the winter. <br /> 12)The aeration diffusers in the wastewater ponds will be cleaned and serviced while the <br /> pond levels are low. <br /> Sewer jetting should be wrapped up by the first week of October. Following <br /> completion, Blakeman pumping will be cleaning the City's duplex lift stations. <br />
The URL can be used to link to this page
Your browser does not support the video tag.