My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
03 2020 Road Improvement Project Designs
Laserfiche
>
City Council (Permanent)
>
Agenda Packets (Permanent)
>
2019
>
08-06-2019 Special City Council Meeting
>
03 2020 Road Improvement Project Designs
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/1/2019 12:31:01 PM
Creation date
8/1/2019 12:31:00 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Pequot Lakes WIDSETH <br /> Rasmussen Road and South Washington Avenue SMITH <br /> Typical Sections for Final Design , <br /> August 6,2019 NOLTING <br /> Page 3 of 6 <br /> South Washin�ton Avenue- Main Street to East Woodman Street <br /> 17. No previous Study <br /> 18. No layout(but an estimated level of improvements were used to determine a project budget) <br /> a. Replace sanitary sewer and watermain under the two blocks <br /> b. Replace`as is' in the Woodman to Butler block <br /> c. New curb and gutter street and storm drainage in the Butler to Main block <br /> 19. Beginning of the final design phase was approved last month <br /> 20. But, because there was no Study, before proceeding with final design,we NEED immediate feedback from the <br /> City Council on the typical sections <br /> 21. First, improvements to underground utilities. <br /> 22. Sanitary sewer replacement from Woodman Street to Main Street <br /> 23. Water main replacement from Woodman Street to Main Street <br /> 24. Storm drainage from Woodman Street to Butler Street"as is" <br /> 25. Storm drainage from Butler Street to Main Street via storm sewer to Main Street system (most goes there <br /> already) <br /> 26. Now,onto roadway/surface improvements. Intend to stay within R/W from Butler to Main,and within existing <br /> "prescriptive easement"from Woodman to Butler. <br /> 27. After a cursory review of existing conditions and discussing with Staff,we are proposing the following typical <br /> sections be used for final design: <br /> 28. Woodman to Butler- Existing <br /> a. Existing is an approximate 22-24 feet wide bituminous roadway <br /> 29. Woodman to Butler-Proposed <br /> a. Proposing to basically replace"as is"with 24 feet wide bituminous roadway <br /> -Rest of page is intentionally blank- <br />
The URL can be used to link to this page
Your browser does not support the video tag.