My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10 - Water Wastewater Monthly Report
Laserfiche
>
City Council (Permanent)
>
Agenda Packets (Permanent)
>
2009
>
01-06-2009 Council Meeting
>
10 - Water Wastewater Monthly Report
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/16/2014 12:51:41 PM
Creation date
5/21/2014 8:33:07 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Wastewater Department <br /> 1. wastewater Plant Performance: <br /> a. Flow: <br /> Average Daily Flow: 52,400 gallons (Design— 121,795 gal/day) <br /> Maximum Daily Flow: 68,000 gallons <br /> Minimum Daily Flow: 27,000 gallons <br /> Total Monthly Flow: 1,515,000 gallons(as of the 291h) <br /> b. CROD Concentration <br /> Influent—mg/1 (Design—250 mg/1) <br /> Effluent—mg/1 <br /> c. TSS Concentration <br /> Influent— mg/1 (No Design Listed) <br /> Effluent—mg/l <br /> `-- d. Effluent Fecal Coliform— organisms/100 ml <br /> Permit Condition—200 organims/100 ml <br /> 11. Operations and Maintenance: <br /> • The monthly MPCA Discharge Monitoring Report will be completed and submitted as <br /> required. <br /> • I attended an MWOA (MN Wastewater Operators Association)Meeting in St. Cloud on <br /> Dec. 90' <br /> • On Dec. 2&,Greg w/PRASD noticed that MH#77(in front of Thurlow's)was starting <br /> to back up. I came in and we jetted the lines.No problems occurred from this. Roots <br /> were the cause of the back-up. This is a manhole that we check daily. <br /> Report Submitted By: Tina Noiden (Water/Wastewater Operator) <br />
The URL can be used to link to this page
Your browser does not support the video tag.