Laserfiche WebLink
�art of the buildin�hei�ht. <br /> (2) Solar Energy. Equipment for the capture and transfer of solar <br /> energy shall be exempted from (1) of this section, provided that the <br /> equipment is designed and located to blend with the overall design of the <br /> structure. <br /> L Outdoor Recreation (Sports Stadiu�is and Play Ia'ields): <br /> (!) Site plan submittal shall include the following: <br /> a) Access to a major collector road; <br /> b) Proposed play fields; <br /> c) Proposed accessory structures, concession buildings and bleachers; <br /> d) Municipal water/wastewater availability or Subsurface Sewage <br /> Treatment System Design and water well; <br /> e) Refuse containment and collection plan. <br /> (2) 7'he stadium/play field shall be surrounded by a security fence and <br /> a. 1<��k��� ���te wh�.r� n��t ir� ��ce= <br /> J. Landscaping. (insert Landscape Standards) <br /> (Ir���c��r�����rale R� C'��rnmerlts) <br /> K. Architectural Standards. (insert Architectural Standards) <br /> (It1����rpu��ate IZS C�ur►�irleiris) <br /> L. Architectural Review Submittal: <br /> The following is the minimum information required to be submitted to the <br /> City for review by the Planning Commission or Architectural Review <br /> Committee: <br /> (1) A completed and signed Land Use Permit application form; <br /> (2) A written narrative describing the proposal; <br /> (3) Ten (10) reduced (11 X 17) color sets and an electronic (PDF) <br /> format .,��'��*;,�.,�„��„'",.,,'�„� c,f�tl�ie I��II<�����r1� �1u��i���ac��t�: (I��i <br /> a) Survey: Certified survey of the property by a registered <br /> surveyor, ;�aoo.,..oa .,o o ,�,� �E��) <br /> b) Architectural Plans: Preliminary scaled architectural plans and <br /> colored elevations for the proposed building or buildings with <br /> notation of exterior finish materials; <br /> c) Site Plan: Scaled site plan including landscaping, lighting, site <br /> amenities and mechanical equipment locations. <br /> (4) Samples of exterior finish materials. <br /> (5) Such other i�iforniation as reasor�abl5� deter��ii►ied r�ece�sar�y ��y ttle <br /> Z,�nitlg S}�ec;ialist_ (KS) <br /> M. Administration: <br /> Pequot Lakes Staff Report �(a)-4 <br /> July i8,2019 <br />