Laserfiche WebLink
WIDSETH SMITH NOLTING � <br /> 2019 FEE SCHEDULE <br /> . • <br /> Enaineer/Ardlitectl5untevor/Scientist/Wetland SnedalistlGeoqnoher <br /> level I $105.00 <br /> Level II $125.00 <br /> Level III $152.00 <br /> Level N $165.00 <br /> Level V $180.00 <br /> Technician <br /> Level I $70.00 <br /> Level II $�•� <br /> Level III #105.00 <br /> Leve!N $120.00 <br /> Level V $132.00 <br /> Computer Systems Speaalist $130.00 <br /> Senior Funding Specialist $120.00 <br /> Marketing Specialist $100.00 <br /> Funding Specialist $90.00 <br /> Administrative Assistant #63.00 <br /> • <br /> Mileage(Federal Standard Rate)subject to IRS GuidNines <br /> MealsJLodging � <br /> Stakes&F�cpendable Materials Cost <br /> Waste Water Sampier $40.00/Day <br /> ISCO Flow Recorder �60.00JDay <br /> Photaonization Detection Meter $80.00/Day <br /> Explosimeter �50.00/Day <br /> Product Recovery Equipment $35.U0/Day <br /> Survey-Grade GPS(Global Positioning System) $75.00/Hour <br /> Mapping GPS(Global Positioning System) $150.00/Day <br /> AN �100.00/Day <br /> AN w/Tradcs �200.00/Day <br /> Soil Drilling Rig 535.00/Hour <br /> Groundwater Sampling Equipment $75.00/Day <br /> Subcontractors Cost Plus 10°l0 <br /> - � � . . � <br /> Black&White Copies:8'/z x 11 $0.10 <br /> Black&White Copies: il x 17 #0.50 <br /> Black&White Copies:24 x 36 $3.00 <br /> Color Copies:8�/z x 11 #2•00 <br /> Color Copies: 11 x 17 $4.00 <br /> Color Copies:24 x 36 $12•00 <br /> Color Plots:42 x 48 $22•00 <br /> . . � . .� <br /> - . . �. <br />