My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
09 Public Works Report
Laserfiche
>
City Council (Permanent)
>
Agenda Packets (Permanent)
>
2019
>
07-02-2019 City Council Meeting
>
09 Public Works Report
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/25/2019 3:49:30 PM
Creation date
6/25/2019 3:49:30 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Compiled and submitted by Jason Gorr—Pequot Lakes Public Works Director <br /> Please direct questions to: (612)810-9478 or jgorr(a�qequotlakes-mn.gov <br /> Water Dept. <br /> Facility Performance for May 2019: <br /> Flow <br /> Average daily gallons pumped: 97,000 gallons <br /> Maximum daily gallons pumped: 141,000 gallons <br /> Minimum daily gallons pumped: 66,000 gallons <br /> Total monthly gallons pumped: 2,908,000 gallons <br /> Lab <br /> Average daily chlorine concentration: 0.39 (mg/1) <br /> *Recommended chlorine concentration: 0.2 to 0.5 mg/1 <br /> Average daily fluoride concentration: 0.78 (mg/1) <br /> *Recommended fluoride concentration: 0.5 mg/1 to 0.9 mg/1 <br /> Wastewater Deqt. <br /> Facility Performance for Apri12019: <br /> Flow <br /> Average Daily Flow: 59,455 gallons (Design— 121,795 gaUday) <br /> Maximum Daily Flow: 69,578 gallons <br /> Minimum Daily Flow: 48,011 gallons <br /> Total Monthly Flow: 1,843,095 gallons <br /> Operations Report <br /> 1) Water treatment facility inspections were completed daily. <br /> 2) Wastewater facility and lift station checks were done every Monday, Wednesday, and <br /> Friday. <br /> 3) Monthly lift station maintenance (check amps, clean floats, inspect wet well, etc) was <br /> completed on 6/17. <br /> 4) Weekly water testing was completed. <br /> 5) Water meters were read on 6/21. <br /> 6) Monthly fluoride report was submitted to Minnesota Department of Health on 6/1. <br /> 7) Monthly Discharge Monitoring Report for the WWTP was submitted to MPCA on 6/3. <br /> 8) Quarterly Discharge Monitoring Report for the WTP was submitted to MPCA on 6/3. <br /> 9) Wastewater pond dikes have been sprayed for weed control. <br /> 10)We are working on a couple minor fixes on the WWTP spray irrigation system. <br /> Otherwise it has worked well so far this summer. <br /> 11)The dehumidifiers in the water treatment plant have failed. A new Hi-E-Dry <br /> commercial grade unit designed for treatment plants was ordered from Alden Pool. <br /> 12)We repaired a fire hydrant in a utility easement off Engen road behind the Animal <br /> Hospital a few weeks ago. <br /> 13)Both sewage pumps at the Trailside lift station were pulled and cleaned. <br /> Water/WW Report respectfully submitted by: <br /> Andrew Schwartz, Operations Manager, Pine River Area San. Dist. <br /> Please call ce11320-232-5787 with any questions/concerns or 24-hour emergency at 218-851-9060 <br />
The URL can be used to link to this page
Your browser does not support the video tag.