My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6(a) Nathan Walberg - Cease and Desist Letter
Laserfiche
>
Planning & Zoning
>
Agenda Packets
>
2019
>
06-20-2019 Planning & Zoning Commission Meeting
>
6(a) Nathan Walberg - Cease and Desist Letter
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/17/2019 12:13:38 PM
Creation date
6/17/2019 12:13:35 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Citr af <br /> Pequat <br /> Lakes==- <br /> NATHAN WALBERG—DISCUSSION <br /> Agenda Item: 6 (a) <br /> Background Information: Zoning Specialist Bittner explained at the May 16 <br /> meeting the City had issued a cease and desist order on May 15 regarding his use of the <br /> right-of-way along Patriot Avenue, no parking for customers, and fire access. Mr. <br /> Walberg called Bittner to discuss the order in which he accused the City of selective <br /> enforcement of use of the right-of-way. Bittner told him he could address the Planning <br /> Commission with his concerns and he stated he would attend the June 20 Planning <br /> Commission meeting. <br /> The conditions of his Conditional Use Permit are: <br /> 1. No tire sales, exterior display of sawmills, or repair/maintenance work on <br /> customer owned vehicles may be allowed on the subject property until the <br /> conditions of this permit are fulfilled. <br /> 2. There shall be no exterior storage of tires. <br /> 3. Fifty percent screening shall be maintained along Patriot Avenue. <br /> 4. A floor drain/sediment trap shall be installed in the auto repair area in accordance <br /> with MDH's best management practices. The floor drain shall be connected to a <br /> holding tank and pumped regularly. The holding tank system shall be designed <br /> by a licensed SSTS designer or licensed plumber. A copy of a <br /> maintenance/pumping contract shall be submitted to the city. The floor <br /> drain/holding tank system shall be installed by August 30, 2019. <br /> 5. All garbage, used oil and related waste shall be disposed of in accordance with <br /> MPCA regulations. <br /> 6. No more than fifteen (15) inoperable units (vehicles and sawmills) shall be <br /> present on the property at any given time. <br /> 7. All mechanic work on vehicles shall be conducted within an enclosed structure. <br /> 8. Signage shall be permitted by separate application. <br /> 9. There shall be no more than a total of one hundred fifty (150) vehicles and <br /> sawmills allowed on the subject property. The maximum number allowed is a <br /> combination of vehicles and sawmills. <br /> 10. Parking areas shall be set back a distance of 10' or greater from side property <br /> lines in areas that are not screened by a fence. <br /> 1 l. A 6'-7' high wooden privacy fence shall be constructed along the south property <br /> line. The fence shall commence at the rear of the front building and run west to <br /> the front of the rear building. The fence shall be a minimum of 3 feet from the <br /> south property line. The fence shall be installed by August 30, 2019. <br /> Pequot Lakes Staff Report 6(a)-i <br /> June 20,2oi9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.