Laserfiche WebLink
May 215Y, 2019 Pequot Lakes Public Works <br /> Honorable Mayor and Council, <br /> Included you will find the 2019 Streets Survey(summary&spreadsheet)to better assist streets <br /> improvement decisions. By documenting up to date information and as concisely as possible, conveying <br /> current conditions and needs, I hope to give you the tools necessary to be informed and educated on <br /> the topics of streets. <br /> Our rating system has a TOTAL POINTS column and this is a great guide, but please keep in mind it is just <br /> that, a guide. Further data has been added,and although not assessed point values, it's also detailed for <br /> good reason.This document is intended to be used as a reference guide. <br /> 1'll also volunteer a brief presentation of data and reasoning of process at the council meeting, as well as <br /> offer Q&A as needed both there and at any time before or after. <br /> Recommendations for Priority and Action: <br /> 2019/2020: »It is our position this work should start as soon as possible/able. We've already <br /> applied over 13 tons of UPM (pothole patch)on Rasmussen this season alone. <br /> (Below is merely a cost estimate based on both Anderson Brothers rough numbers offered and full costs <br /> are already fully ID'd through WSN's engineering and presentation. These would also include potential <br /> w/ww/Storm/Curb/Gutter/etc.) <br /> - #1)Rasmussen Road (Sibley>E.Woodman). Tot�l F���ir�t�: 1��; Pav�r��r}t; 5�; 50-year-old <br /> Water/WW (clay) Line; Curb/Gutter Needs. Estimated pavement costs included within the WSN <br /> proposal. Total scope to include pavement,curb/gutter/storm sewer,water/WW upgrade, & <br /> all related costs:$1.2 million <br /> - #4) Rasmussen Road (E.Woodman>Tree Farm Rd). T�t�l Paints; �C�; F�av�rn�r�t: StI; 50-year- <br /> old Water/WW(clay) Line; Curb/Gutter Needs. Estimated pavement costs included within the <br /> WSN proposal. Total scope to include pavement,curb/gutter/storm sewer,water/WW <br /> upgrade,&all related costs:^'$1.3 million <br /> - #5)S.Washin�ton. Total Points: �t.i; Pavement: 50;close proximity and potentially <br /> interconnected to Rasmussen Infrastructure improvements Projects. Definite needs to update <br /> existing Water/WW/Storm. Per WSN factors and estimated cost^'$175,000 or$225,000(if the <br /> N block is to include Curb/Gutter/Storm) <br /> - #6)15t Street. T�st�� ���a+�t�; �d�; �����nent; 5�; Pavement in very poor shape, useful frontage <br /> road access for several businesses and close proximity to Patriot&other potential projects. <br /> 35 000 <br /> »»another option would be to remove this section of 15t Street totally and simply <br /> replace with a small access driveway for the one business&sculpt the remainder into <br /> additional storm/grass Blvd. <br />