My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
04-18-2019 Planning Commission Meeting Minutes
Laserfiche
>
Planning & Zoning
>
Minutes
>
2019
>
04-18-2019 Planning Commission Meeting Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/21/2019 9:17:23 AM
Creation date
5/21/2019 9:17:20 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
8. Ownership and long-term maintenance responsibilities/obligations for the sewer <br /> system shall be described in the development covenants. <br /> 9. The cluster sewer system shall conform to Minnesota Pollution Control Agency <br /> Standards (Chapter �080 — �083 of the Minnesota Administrative Rules) and the <br /> City of Pequot Lakes SSTS standards. The final plat shall not be signed until the <br /> final SSTS design is reviewed and approved by an Advanced Inspector per <br /> Minnesota Rules. <br /> io.The cluster water system shall conform to the Minnesota Department of Health <br /> Rules and Regulations MHD 2io-23o "Water Well Construction Code", and the <br /> cluster system shall receive the approval of the City Engineer. <br /> ii. The city attorney shall review and approve the declaration,covenants,by-laws,etc. <br /> before the final plat is signed. <br /> i2. The developer shall pay a park dedication fee in the amount of $14,040.0o in <br /> accordance with Section 1�-g.io "Dedication to the Public — Standards". (4i6 X <br /> 2.25 PPH = $936 X i5lots = $�4,040.). <br /> i3. Prior to the submission of a Final Plat application the applicant shall provide for <br /> the construction of the required improvements at their expense and shall have the <br /> work completed or shall enter a Development Contract and give bond or other <br /> financial assurance satisfactory to the Council in an amount equal to 125% of the <br /> estimated cost of the uncompleted improvements except as provided in io.3. The <br /> bond shall be released by the City Council upon the recommendation of the City <br /> Engineer indicating the improvements are satisfactorily complete. <br /> All members voted"aye". Motion carried. <br /> APPLICANT: Brandon Andersen <br /> Applicant requests an Ordinance Amendment to Expand the Offsite Sign <br /> Overlay District <br /> Mr. Burslie explained the Staff Report. Applicant was present. <br /> Vice-Chair Birch asked the applicant if he would like to address the ordinance language. <br /> Mr.Andersen stated he believed the intent of the ordinance is meant to allow signage <br /> along this corridor and he is requesting his properry be included in the Overlay District. <br /> PUBLIC COMMENT OPENED: <br /> No comments. <br /> PUBLIC COMMENT CLOSED. <br /> Planning Commission Member Norton asked if Staff had determined only one sign in <br /> the linear footage would be allowed. <br /> MINUTES i� <br /> Pequot Lakes Planning Commission <br /> April i8, 2oig <br />
The URL can be used to link to this page
Your browser does not support the video tag.