My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
9 P & Z Administrator's Report
Laserfiche
>
Planning & Zoning
>
Agenda Packets
>
2019
>
05-16-2019 Planning & Zoning Commission Meeting
>
9 P & Z Administrator's Report
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/9/2019 12:41:04 PM
Creation date
5/9/2019 12:41:02 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
23.The variance request has not been made based on economic considerations. i <br /> Please note the Board of Adjustment included the following Conditions in their motion I <br /> to approve your Variance request: ' <br /> i. Before a permit is issued for the additional impervious surface coverage, the '� <br /> applicant shall submit a stormwater management plan created by a licensed � <br /> engineer which contains the �o-year, 24 hour storm event on the subject properry � <br /> for all new impervious surfaces. Said plan shall be implemented in full. ', <br /> Section ��-��.�(�) of the Pequot Lakes City Code states "Failure by the owner to act � <br /> within 6 months on a Variance unless extended by the Board of Adjustment shall Uoid <br /> the Variance. A second extension shall require a new public hearing." If you have any <br /> questions,please feel free to contact me. <br /> Sincerely, <br /> Dawn Bittner <br /> Zoning Specialist <br /> C: Board of Adjustment <br />
The URL can be used to link to this page
Your browser does not support the video tag.