Laserfiche WebLink
Operations Report <br /> 1) Water treatment facility inspections were completed daily. <br /> 2) Wastewater facility and lift sta.tion checks were done every Mon,Wed, and Fri. <br /> 3) Monthly lift station maintenance(check amps, clean floats, inspect wet well, etc.)-4/22. <br /> 4) Weekly water testing was completed. <br /> � Water meters were read on 4/22. <br /> � Monthly fluoride report was submitted to Minnesota Department of Health on 4/1. <br /> 'n Monthly Discharge Monitoring Report was submitted to MPCA on 4/1. <br /> S) I missed a NIDH required bacteria test during a busy week in early Mazch resulting in a <br /> notice of violation. After discussing this with MDH, I have learned that there will be no <br /> enforcement action or fine. We will double check our sampling schedule for 2019 and <br /> make sure we don't miss another. <br /> 9) We worked with Karl Moon(Moon Lighting and Electrical) and replaced the electrical <br /> panel at the Brown Street lift station. <br /> 10)Lift station valve vaults were inspected and isolation valves exercised. <br /> 11)Fire hydrants on the City's water distribution system were flushed, exercised, and oiled <br /> on 4/18. <br /> 12)Lift station telemetry unit batteries were replaced. We do this every 2-3 years to make <br /> sure the units will perform in a power outage. <br /> 13)Iron and manganese solids were pumped from our reclaim tank in the water treatment <br /> plant to the seepage basin behind the facility. This is done on an annual basis. <br /> Water/WW Report respectfully submitted by Andrew Schwartz-Operations Manager, <br /> Pine River Area Sanitary District <br /> Please call cell 320-232-5787 with any questions/concerns or 24-hour emergency at 218-851-9060 <br />