My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3(c) Conditional Use Permit "The Range" Resort Development LLC/Premier Homes
Laserfiche
>
Planning & Zoning
>
Agenda Packets
>
2019
>
04-18-2019 Planning & Zoning Commisison Meeting
>
3(c) Conditional Use Permit "The Range" Resort Development LLC/Premier Homes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/12/2019 8:38:05 AM
Creation date
4/12/2019 8:37:54 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
87
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
O. Name of subdivision and proposed street names, which shall not <br /> duplicate or be alike another plat previously recorded. <br /> P. Stages of development proposed. <br /> 3. Evidence of Authority to subdivide the parcel consisting of fee ownership <br /> or written concurrence of fee owners. <br /> 4. CostBenefit Analysis. An analysis of the ongoing cost to the City to <br /> provide services and maintenance to the development shall be prepared. This cost <br /> shall be compared to the estimated increased valuation of the properiy and the <br /> corresponding ta�c revenue. The development shall not be approved if public <br /> subsidy is required for ongoing services and maintenance. <br /> Section 17-11.6 CONDITIONAL USE PERMITS <br /> 1. Conditional Use Permits shall be issued to the property for structures or <br /> other specified uses after a public hearing and approval by the Planning <br /> Commission. All applications for a Conditional Use Permit shall be submitted to <br /> the Zoning Administrator 30 days ahead of the hearing date, accompanied by a <br /> certificate of survey (unless waived by the Zoning Administrator) showing the <br /> details of the proposal and an accurate legal description, along with the <br /> appropriate fee. The fee or contract owner of the property shall sign the <br /> application. The Zoning Administrator shall notify all property owners within a <br /> minimum of 350 feet by regulaz mail and shall advertise the hearing once in the <br /> legal section of the official newspaper at least 10 days ahead of the public <br /> hearing. The Zoning Administrator sha11 send the same notice 10 days in advance <br /> of this hearing to the DNR if the proposed is in shoreland. At the applicant's <br /> option, the applicant may request a sketch plan review with no action by the <br /> Planning Commission and omit by giving 14 days notice thereof to the Zoning <br /> Administrator,meeting time permitted. <br /> 2. Submissions for Conditional Use Permit. The applicant shall complete the <br /> Conditional Use Permit application approved by the City Council. The <br /> application shall contain submittal requirements, criteria for approval, procedure <br /> for consideration and City contact information. T'he City shall not accept <br /> applications where the applicant has past due fees or charges due to the City until <br /> the account is made current. <br /> 3. In permitting a new Conditional Use or alteration of an existing <br /> Conditional Use, the Planning Commission may impose, in addition to the <br /> standards and requirements expressly specified by this Ordinance, additional <br /> conditions that the Planning Commission considers necessary to protect the best <br /> interest of the surrounding area or the City as a whole. These conditions may <br /> include,but are not limited to the following: <br /> Pequot Lakes Staff Report 3(c)-i6 <br /> April i8,2oi9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.