Laserfiche WebLink
�.. east of the existing junction of Highway 371 and CSAH 11. The bypass would continue north <br />and converge with the existing Highway 371 alignment approximately 1.5 miles south of the <br />existing Highway 371 /CSAH 16 intersection and continue north along the existing alignment <br />through Jenkins to CR 2/42 in Pine River. <br />The Pequot Lakes Bypass segment of Alternative 3MOD from south of CR 107/168 to <br />approximately 1.5 miles south of CSAH 16 would be access controlled with only three at -grade <br />access points planned for the entire length of the bypass. The proposed access points include the <br />junctions of CR 107/168 at the south end of the bypass, CSAH 11, and CR 112. Only the CSAH <br />11 intersection is planned to be signalized at the time of construction. <br />Alternative 3MOD also includes the purchase of right -of -way needed for the construction of a <br />future interchange at the.junction of the bypass and Crow Wing CSAH 11. <br />Alternative 3MOD was developed and selected as the preferred alternative for the following <br />reasons: <br />1) It meets the proLpuruose and need <br />a) Increases Corridor Safety —Assessment of the projected safety benefits of the selected <br />alternative ( Altemative 3MOD) versus the through-city alternative (Alternative 2) and <br />No Build was performed by comparing the current statewide average crash density <br />statistics between Rural 4 -Lane Expressway roadways (similar to Alternative 3MOD), <br />Urban 4 -Lane Expressway (similar to Alternative 2), and the existing 2 -Lane section <br />through Pequot Lakes (No Build). This assessment indicates substantial safety benefits <br />would result from a Rural 4 -Lane Expressway (see Table 1 below). <br />Table 1- Statewide Average Crash Density (2007- 2009) <br />Alternative <br />Typical Section <br />Crash Density <br />(crashes /mile/year) <br />3MOD <br />Rural 4 -Lane Expressway <br />3.5 <br />2 <br />Urban 4 -Lane Expressway <br />16.9 <br />No Build <br />Urban 2 -Lane (ADT > 8,000) <br />10.3 <br />The removal of Highway 371 through downtown Pequot Lakes under Alternative <br />3MOD would also improve bicycle /pedestrian mobility and safety within the existing <br />highway alignment through Pequot Lakes by reducing the peak and through traffic <br />volumes fromthe downtown corridor. <br />b) Improve Mobility - The operation of Alternative 3MOD, including the Pequot Lakes <br />Bypass, under 2030 traffic conditions is projected to reduce congestion and, therefore, <br />improve mobility by decreasing travel delays along the Highway 371 corridor. <br />Table 2 shows the estimated 2030 total annual vehicle hours of travel and total annual <br />delay within the Highway 371 EIS study corridor for Alternative 1— No Build, <br />Alternative 2, and Alternative 3MOD. <br />TH371 <br />Nisswa to Pine River <br />5 <br />Adequacy Determination <br />October 2010 <br />