My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
09 Public Works Report
Laserfiche
>
City Council (Permanent)
>
Agenda Packets (Permanent)
>
2019
>
04-02-2019 City Council Meeting
>
09 Public Works Report
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/28/2019 11:08:26 AM
Creation date
3/28/2019 11:08:25 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Water Dept <br /> Facilitv Performance for Februarv 2019: <br /> Flow <br /> Average da.ily gallons pumped: 86,000 gallons <br /> Maz�imum da.ily gallons pumped: 155,000 gallons <br /> Minimum daily gallons pumped: 37,000 gallons <br /> Total monthly gallons pumped: 2,312,000 gallons <br /> Lab <br /> Average daily chlorine concentration: 0.4 (mg/1) <br /> �Recommended chlorine concentration: 0.2 to 0.5 mg/1 <br /> Average daily fluoride concentration: 0.5 (mg/1) <br /> *Recommended fluoride concentration: 0.5 mg/1 to 0.9 mg/1 <br /> Wastewater Dep� <br /> Facilitv Performance for Februarv 2019: <br /> Flow <br /> Average Daily Flow: 65,311 gallons (Design— 121,795 gaUday) <br /> Maximum Daily Flow: 82,831 gallons <br /> Minimum Daily Flow: 54,643 gallons <br /> Tota1 Monthly Flow: 1,828,703 gallons <br /> Operations Report <br /> 1) Water treatment facility inspections were completed daily. <br /> 2) Wastewater facility and lift station checks were done every Monday,Wednesday, and <br /> Friday. <br /> 3) Monthly lift station maintenance(check amps, clean floats, inspect wet well, etc.)was <br /> completed on 3/22. <br /> 4) Weekly water testing was completed. <br /> 5) Water meters were rea.d on 3/21. <br /> � Monthly fluoride report was submitted to Minnesota Depariment of Health on 3/5. <br /> � Monthly Discharge Monitoring Report was submitted to MPCA on 3/5. <br /> 8) Quarterly Discharge Monitoring Report was submitted to MPCA on 3/5. <br /> 9) Several water service lines around town froze in late February and early March. <br /> Luckily,we were able to get them all thawed without having to dig up any streets. <br /> 10)I will be providing the Park Commission with some water and sewer utility specific <br /> information to help with design of the splash pad in Trailside Park. <br /> 11)The 2004 Ford City-owned service truck will be pazked in front of City Hall in early <br /> May and sold shortly thereafter. <br /> 12)We have received our new electrical panel and plumbing for the Brown/Heath lift <br /> station. I'm planning on scheduling the work to be done in the next few weeks. <br /> 13)April will be a busy month for us. We will be replacing all lift station telemetry <br /> batteries, inspecting lift station valve vaults, flushing hydrants,repairing a couple water <br /> service valves, and prepping the wastewater spray irrigation system for summer use. <br /> Respectfully submitted by Andrew Schwartz,Operations Manager, <br /> Pine River Area Sanitary District <br /> Please feel free to call cell at 320-232-5787 with any questions/concerns <br /> For 24-hour emergency service call 218-851-9060 <br />
The URL can be used to link to this page
Your browser does not support the video tag.