Laserfiche WebLink
Cit�a�' <br /> I�equot <br /> L�kes�_=-- <br /> �LD BUSINESS—DISCUSSION <br /> Topic: Heart of the Good Life Development <br /> Agenda Item: � (a) <br /> Background Information: Below are the Architectural Standards discussed at <br /> the February Planning Commission Meeting. These were presented to the <br /> Economic Development Commission on March ig and Staff will provide their <br /> comments at the Planning Commission Meeting. <br /> Architectural Design Standards: <br /> E�erior Building Finishes: <br /> All exterior wall finishes on any principal building shall be one of, or a <br /> combination of, the following: <br /> A. Face brick; <br /> B. Natural or cut stone, wood, or log; <br /> C. Architectural metal panels <br /> D. Non-architectural metal <br /> a. Shall be limited to a m�imum coverage of twenty percent (50%) on <br /> all sides. <br /> b. All non-architectural metal material applications are required to <br /> have concealed fasteners. <br /> c. Finished metal overhead doors necessary for the use are exempt <br /> from the twenty percent (50%) m�imum. <br /> d. No unfinished metal of any kind is allowed. <br /> E. Specially designed, precast concrete units if the surfaces have been <br /> integrally treated with an applied decorative material or texture, excluding <br /> raw concrete block, painted or unpainted; <br /> F. Glass, fiberglass, or similar non-metal materials; <br /> G. Stucco and other cementation coating applied in a manner so as to create a <br /> harmonious design in conjunction with the materials; <br /> H. The Planning Commission may approve other new materials that are equal <br /> to or better than the materials listed in this section; <br /> I. All principal structures shall be compatible with neighboring structures in <br /> mass, color, and exterior materials <br /> Construction T�e: <br /> A. Post/pole frame constructed buildings shall not be allowed. <br /> Accessory Structures: <br /> All accessory structures shall have an exterior finish and color that matches the <br /> finishing materials and color on the principal structure. <br /> Pequot Lakes Staff Report �(a)-i <br /> March 2i,2oi9 <br />