My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10.01 - Wildlife Tr/N Sleutter Rd Prem Assessment
Laserfiche
>
City Council (Permanent)
>
Agenda Packets (Permanent)
>
2010
>
11-09-2010 Council Meeting
>
10.01 - Wildlife Tr/N Sleutter Rd Prem Assessment
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/15/2014 11:33:09 AM
Creation date
5/15/2014 11:31:44 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
45
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
I,, <br />Based upon the information contained herein, we recommend a public hearing (preliminary <br />f� <br />assessment hearing) be conducted with both this project's residents and the residents along the <br />proposed Wildlife Trail project so that a review can be made with everyone on whether the <br />proposed improvements are necessary, cost effective, feasible, and should be made individually <br />f� <br />or combined. <br />The following is recommended: <br />1. The City should review this report. <br />2. The City should proceed to calling for a preliminary assessment hearing. <br />3. After this above step, the City can then determine if the project should continue to <br />proceed. <br />4. If the project should proceed, the City should authorize the necessary design, <br />engineering, legal, funding, and administrative tasks associated with a special <br />assessment project. The City should also decide the special assessment methodology. <br />With the time of year, we anticipate that a possible schedule would be to take care of the special <br />assessment preliminary matters (notices and hearing) late this year. If the project would <br />proceed, survey (unfortunately in the snow) and design would occur at the beginning of 2011 <br />with bidding and construction in the summer of 2011. <br />Note that there is also a time line for the City to obtain bonds to pay for these improvements <br />(again, as mentioned on the previous page, even if this project is 100% specially assessed, the <br />City has to pay various project - related and construction costs before special assessments are <br />paid to the City). <br />Pequot Lakes — North Sluetter Road Improvements Study <br />WSN No. 0130130045.000 Page 13 <br />
The URL can be used to link to this page
Your browser does not support the video tag.