My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
03.01 City Council Minutes
Laserfiche
>
City Council (Permanent)
>
Agenda Packets (Permanent)
>
2019
>
03-05-2019 City Council Meeting
>
03.01 City Council Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/28/2019 10:44:20 AM
Creation date
2/28/2019 10:44:19 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
City Council Minutes <br /> February 5, 2019 <br /> Page6of13 <br /> ----------------------------- <br /> course and she suggested that Mayor Tayloe volunteer as this would be <br /> an educational opportunity for him. <br /> Mayor Tayloe volunteered to participate in the Land Use Incentive <br /> Program. <br /> 8. Police <br /> 8.1. Annual Report <br /> Sergeant Turcotte presented the 2018 Pequot Lakes Police Department <br /> Annual Report to the Council. <br /> 9. Public Works Report <br /> The January 2019 Public Works Report and December 2018 <br /> Water/Wastewater Report were received by Council. <br /> 9.1. Public Works Facilitv Update <br /> Jason Gorr explained that Boser Construction is addressing the remaining <br /> major punch list items on the Public Works Facility. <br /> Tim Houle noted that Boser Construction and the City have yet to come to <br /> an agreement on some contractual items and correspondence is currently <br /> being reviewed. <br /> 9.2. Traffic Studv <br /> Tim Houle explained that WSN is preparing a traffic study proposal but <br /> narrowing down the intersections to be counted is a challenge. Mr. Houle <br /> explained the following finro traffic study approaches for Council <br /> consideration. <br /> • One approach is to concentrate on six downtown main intersections for <br /> the video traffic counting and analysis. This would include the <br /> gathering of data, analysis, traffic layouts, and meetings with the final <br /> result of a traffic study report. The cost for this approach would be <br /> approximately$15,000. <br /> • The second approach is to concentrate on six downtown main <br /> intersections and six additional intersections which would consist of <br /> County Road 17, North Patriot Avenue, South Patriot Avenue, and the <br /> Interchange roundabouts. The cost for this approach would be <br /> approximately$25,000. This would also be a video counting study <br />
The URL can be used to link to this page
Your browser does not support the video tag.