My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6(a) Land Use Permit Extension - Donald and Catherine McFee
Laserfiche
>
Planning & Zoning
>
Agenda Packets
>
2019
>
02-21-2019 Planning & Zoning Commission Meeting
>
6(a) Land Use Permit Extension - Donald and Catherine McFee
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/13/2019 11:14:46 AM
Creation date
2/13/2019 11:14:46 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
� � <br /> �'���o� <br /> I���� <br /> NEW BUSIlVESS—PERMIT EXTENSION <br /> Application: Land Use Permit Extension <br /> Applicant: Donald and Catherine McFee <br /> Agenda Item: 6 (a) <br /> Background Information: Donald and Catherine McFee were issued Land <br /> Use Permit #i6-26 June i6, 2oi6 to remove the existing dwelling and construct a <br /> new dwelling. The existing dwelling was removed. Due to unforeseen <br /> circumstances, the McFee's were unable to begin construction of the new <br /> dwelling. On July 3i, 2018 Land Use Permit #18-56 was administratively issued <br /> extending the permit for six months, to January 3�, 2oi9. The septic system was <br /> installed and half of the footings were constructed during the six-month permit <br /> extension. <br /> Mr. and Mrs. McFee have applied for a permit extension to construct the new <br /> dwelling. They ha�e requested the permit be e�rtended to April i5, 2020. <br /> Mr. McFee will attend the Planning Commission meeting to answer any <br /> questions you may have. <br /> Applicable Regulations: <br /> Section��-�1.8 LAND USE PERMITS <br /> �. Unless extended by the Zoning Administrator, where a Land Use <br /> Permit has been issued but no action has occurred within 12 months, the <br /> Land Use Permit shall be null and void. F.xterior work on the structure <br /> shall be complete in 24 months from the issuance of the Land Use Permit. <br /> The time limit may be extended up to six months by the Zoning <br /> Administrator for good cause. A second extension shall be decided by the <br /> Planning Commission. <br /> Staff Recommendation: We recommend that Land Use Permit #i8-56 be <br /> extended to April i5, 2020 or to a date determined by the Planning Commission. <br /> Pequot Lakes Staff Report 6(a)-i <br /> February 2i,2oig <br />
The URL can be used to link to this page
Your browser does not support the video tag.