My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
09.01 Public Works Facility Update
Laserfiche
>
City Council (Permanent)
>
Agenda Packets (Permanent)
>
2019
>
02-05-2019 City Council Meeting
>
09.01 Public Works Facility Update
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/1/2019 12:29:39 PM
Creation date
2/1/2019 12:29:39 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
AGENDA ITEM #9.1 <br /> CZI�►O� <br /> Pequot <br /> Lakes=� _- <br /> REPORT TO CITY COUNCIL <br /> Report Prepared by: Jason Gorr—Public Works Director <br /> Date: February 5, 2019 <br /> Subiect: Public Works Facility Update <br /> Report: After meeting with Mayor Tayloe, Council Member Pederson, and <br /> City Administrator Malecha, Widseth Smith Nolting (WSN) sent Boser <br /> Construction a letter requesting they finalize inside punch list work, requesting a <br /> credit for finishing the project after the Contract's substantial completion date, and <br /> indicating the City will finish outside punch list items and the seeding. Boser <br /> Construction is currently working to complete the inside punch list items and they <br /> are making fairly good progress. As of the date of writing this memo (January <br /> 30�'), we have not yet heard back from Boser Construcrion. <br /> Council Action Requested: No Council action requested. <br />
The URL can be used to link to this page
Your browser does not support the video tag.