My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10.01 - Feasibility Report for N Sleutter Rd Improve
Laserfiche
>
City Council (Permanent)
>
Agenda Packets (Permanent)
>
2010
>
10-05-2010 Council Meeting
>
10.01 - Feasibility Report for N Sleutter Rd Improve
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/14/2014 9:40:22 AM
Creation date
5/14/2014 9:37:52 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
ESTIMATED ASSESSMENT APPROACH <br />Costs for the project are divided between benefited property owners and the City using policies <br />established in the City of Pequot Lakes' "Assessment Procedures and Policy ", adopted <br />February 7, 2006, including amendments made to the policy since that time. <br />Per this policy, 100% of the roadway improvement project costs for this project are assessed to <br />the abutting benefited property owners on a per front foot basis (the roadway exists, but the <br />addition of new pavement makes this a new project rather than a reconstruction project). <br />Following is an example roadway assessment calculation utilizing the City's present per front <br />foot policy: <br />Estimated Cost of Roadway Improvements .......................... ............................... $ 77,000 <br />East (City) Side Front Footage ........................ ............................... ..........................1,080 <br />West (Township) Side Front Footage .............. ............................... ..........................1,300 <br />TotalFront Footage ......................................... ............................... ..........................2,380 <br />(Note that this estimated front footage includes both sides of the <br />�— roadway, and it accounts for a 3/4 side lot credit — i.e. 1/4 of the side <br />lot footage is used as front footage.) <br />Estimated Assessment Amount per Front Foot ........................... ............................... $ 32 <br />Estimated Assessments for Individual Property Owners on East Side is footage x $32/ft <br />Estimated Amount to City At Large (picking up the West Side ) ............................ $ 42,000 <br />There are also several alternates to the above, some of which would combine this project with <br />possible improvements to Wildlife Trail (per a July 210 Feasibility Report). <br />An example of a "per parcel" calculation just for North Sluetter Road improvements would be: <br />Estimated Cost of Roadway Improvements ........................... ..............................$ 77,000 <br />Number of Parcels ............................................................................. ..............................4 <br />NOTE: This example includes the three lots on North Sluetter, <br />including the comer lot abutting Wildlife Trail, and the one lot in the <br />Township, the cost of which would have to be picked up by the City. <br />Estimated Assessment Amount per Parcel ........................... ............................... $ 19,250 <br />Pequot Lakes — North Sluetter Road Improvements Study <br />WSN No. 0130B0045.000 Page 9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.