Laserfiche WebLink
Police <br />218 -568 -8111 <br />Fax 218 -568 -5647 <br />plpd @pequotlakes- mn.gov t <br />Water Dept. <br />I. <br />II. <br />City of Pequot <br />Lakes <br />4638 County Road 11 <br />Pequot Lakes, MN 56472 <br />www.pequotlakes - mn.gov <br />Water/Wastewater Report <br />September 2010 <br />Facility Performance: <br />Average daily gallons pumped: <br />99,000 gallons <br />Maximum daily gallons pumped: <br />131,000 gallons <br />Minimum daily gallons pumped: <br />64,000 gallons <br />Total monthly gallons pumped: <br />2,574,000 gallons (As of the 26th) <br />Average daily chlorine concentration: 0.2 mg/1 <br />Required chlorine concentration: 0.2 to 0.5 mg/1 <br />Average daily fluoride concentration: 1.0 mg/1 <br />Required fluoride concentration: 0.9 mg/l to 1.5 mg/l <br />Treatment Chemicals Used for the Month: <br />Operations and Maintenance: <br />City Hall <br />218 - 568 -5222 <br />Fax 218 - 568 -5860 <br />cityhall @pequotlakes - mn.gov <br />23.0 lbs Chlorine <br />11.0 gals Fluoride <br />6.4 lbs Potassium Permanganate <br />• The MN Department of Health Monthly Fluoridation Report was completed and <br />submitted. <br />• Sept. 2nd, had two water shut -offs due to delinquent bills. <br />• Sept. 8th, attended MMUA Safety Meeting in Breezy Point. Also, took hearing test. <br />• Sept. 14th, attended Health Insurance Meeting with Mark 3urchen. <br />• Sept. 16th, Lee Bundy (PRASD's new wastewater operator) stopped in and I showed <br />him our daily rounds. <br />• Sept. 21 ", made an appt. with Fyle's to have them clean out six watermain valve -boxes <br />on Sept. 28th. I need access to these valves to determine where the line to the <br />Community Ed Bldg. goes. Mike Roers with MRWA will be coming out early Oct. to <br />use line tracing equipment and hopefully, we will find a shut -off for this bldg. <br />• Sept. 22nd, delivered 9 delinquent water /sewer bill notices. <br />• Also on the 22nd, DH 495 Communication Interface for WTP Program stopped <br />woiidng- Called Cascade and Mike came out the next morning, replaced cable, and got <br />everything up and running again. <br />• Sept. 24", thoroughly cleaned Potassium Permanganate Tank and feed lines. <br />