Laserfiche WebLink
This is for the Study of potential improvements to Rasmussen Road. <br /> An Open House (preparation, attendance, and some follow-up) was added to the scope of the original Study (thus our <br /> additional amount of about $3,500 - Billed minus Contract). weanesaey,January 2,2019 <br /> 3:39:29 PM <br /> Overall, though, the Study took us longer and required more effort than we anticipated, which is on us (thus the over <br /> $5,000 we are not billing the City - Spent minus Billed). <br /> Budget Status Report - CLIENT NAME HERE <br /> "°�: Job-to-Date Contract Total ' Job-to-Date Spent Total � Job-to-Date Total Billed <br /> 20,000 <br /> � <br /> oo,�o <br /> 18,000 <br /> 16,000 <br /> � <br /> L <br /> 0 14,000 � <br /> 0 96. <br /> �...,,... -. .-,..,. .,,.. . ... ., ..:,.�:. .. �,...� .- �,.. - :.: 6 <br /> i .. <br /> 12,000 <br /> 10,000 0° <br /> ryyo• <br /> �� 9� <br /> i <br /> � . ,^, � �, .,�� � ��a,. � � � <br /> $,�0� . <br /> Pequot Lakes Rasmussen Rd Study <br /> Project Name <br /> Show Contract Contract Contrect Contract Spent Spent Spent Spent Total Total Spent <br /> Unposte Labor Consukant Expenses Total Labor Consultant Expenses Total Billed Recelved Hours <br /> d <br /> Project Number:0130B0065.000 Pequot Lakes Rasmussen Rd Study <br /> JTD 9,000.00 250.00 9,250.00 17,982.50 24.53 18,007.03 12,696.50 9,244.50 154.00 <br /> v7.6.732(0078)- Bllling,Project Budgeting,Show Unposted Page 1 of 1 <br />