My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
09 Public Works Report
Laserfiche
>
City Council (Permanent)
>
Agenda Packets (Permanent)
>
2019
>
01-08-2019 City Council Meeting
>
09 Public Works Report
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/4/2019 10:24:13 AM
Creation date
1/4/2019 10:24:12 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Water Deu� <br /> Facilitv Performance for December 2018: <br /> Flow <br /> Average daily gallons pumped: 114,000 gallons <br /> Maximum daily gallons pumped: 173,000 gallons <br /> Minimum daily gallons pumped: 38,000 gallons <br /> Total monthly gallons pumped: 3,419,000 gallons <br /> Lab <br /> Average daily chlorine concentration: 0.43 (mg/1) <br /> '�Recommended chlorine concentration: 0.2 to 0.5 mg/1 <br /> Average daily fluoride concentration: 0.5 (mg/1) <br /> �Recommended fluoride concentration: 0.5 mg/1 to 0.9 mg/1 <br /> Wastewater Dep� <br /> Facilitv Performance for December 2018: <br /> Flow <br /> Average Daily Flow: 61,635 gallons (Design—121,795 gaUday) <br /> Maximum Daily Flow: 71,292 gallons <br /> Minimum Daily Flow: 49,965 gallons <br /> Tota1 Monthly Flow: 1,910,968 gallons <br /> Ouerations Report <br /> 1) Water treatment facility inspections were completed daily. <br /> 2) Wastewater facility and lift station checks were done every Monday,Wednesday,and Friday. <br /> 3) Monthly lift station maintenance(check amps,clean floats,inspect wet well,etc)was completed <br /> on 12/17. <br /> 4) Weekly water testing was completed. <br /> 5) Water meters were read on 12/20. <br /> � Monthly fluoride report was submitted to Minnesota Department of Health on 12/3. <br /> 'n Monthly Discharge Monitoring Report was submitted to MPCA on 12/3. <br /> 8) Quarterly Discharge Monitoring Report was submitted to MPCA on 12/4. <br /> 9) The City's new utility service truck is still being built. It should be ready for delivery soon. <br /> 10) PRASD operators will be assisting Tim Bohmer w/Municipal Service Co in the coming weeks <br /> with some valve replacements in the water treatment plant. This work will be covered by the <br /> NIDH Source Water Protection Grant. <br /> 11) Spring Lake Engineering and Tota1 Control Systems are preparing the programing and hardware <br /> for the process control upgra.de at the City's water treatment facility. Plans are to have the work <br /> completed in mid to late January. <br /> Respectfully Submitted by Andrew Schwartz, Operations Manager, <br /> Pine River Area Sanitary District <br /> Please feel free to call my cell at 320-232-5787 with any questions/concerns <br /> For 24-hour emergency service call 218-851-9060 <br />
The URL can be used to link to this page
Your browser does not support the video tag.