My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10.02 - Change Order #3 for W Lake St Project
Laserfiche
>
City Council (Permanent)
>
Agenda Packets (Permanent)
>
2010
>
09-07-2010 Council Meeting
>
10.02 - Change Order #3 for W Lake St Project
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/12/2014 11:37:39 AM
Creation date
5/12/2014 11:33:32 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
`... <br />Change Order <br />No. 3 <br />Date of Issuance: August 31, 2010 Effective Date: August 31, 2010 <br />Project: 2010 West Lake Street Owner. City of Pequot Lakes Owner's Contract No.: N/A <br />Improvements <br />Contract: Roadway Grading, Paving, and Drainage Improvements Date of Contract: <br />Contractor. DeChantal Excavating, Inc. Engineer's Project No.: 0130B0043 <br />The Contract Documents are modified as follows upon execution of this Change Order: <br />Description: Additional sod for TH 371 ditch near Oasis (225 sq. yd. @ $2.25 / sq. yd.) <br />Additional traffic control for Olson Street detour ($195 lump sum) <br />Salvage sanitary sewer castings (2 at $35 each) <br />Reinstall sanitary sewer castings (2 at $215 each) , <br />Adjust gate valves (2 at $165 each) <br />Attachments: None <br />CHANGE IN CONTRACT PRICE: CHANGE IN CONTRACT TIMES: <br />Original Contract Price: Original Contract Times: ❑ Working days X Calendar days <br />Substantial completion (days or date): August 27. 2010 <br />$ 149.233.43 Ready for final payment (days or date): September 24, 2010 <br />Decrease from previously approved Change Orders [increase] [Decrease] from previously approved Change Orders <br />No. 1 to No. 2 No. to No. <br />Substantial completion (days): <br />$ 2.363.18 Ready for final payment (days): <br />Contract Price prior to this Change Order: Contract Times prior to this Change Order. <br />Substantial completion (date): August 27. 2010 <br />$ 151.596.61 Ready for final payment (date): September 24, 2010 <br />Increase of this Change Order: [Increase] [Decrease] of this Change Order. <br />Substantial completion (date): None <br />$ 1.925.00 Ready for final payment (date): None <br />Contract Price incorporating this Change Order: Contract Times with all approved Change Orders: <br />Substantial completion (date): August 27, 2010 <br />$ 153.521.61 Ready for final payment (date): September 24. 2010 <br />RECOMMENDED: <br />By: <br />Engine (Authorized Signature) <br />Date: _ I <br />Approved by Funding Agency (ii applicable): <br />ACCEPTED: <br />By. <br />Date: <br />Owner (Authorized Signature) <br />ACCEPTED: <br />By: <br />Contractor (Authorized Signature) <br />Date: <br />Date: <br />EJCDC No. C- 941(2002 Edition) Page 1 of 1 <br />Prepared by the Engineers' Joint Contract Documents Committee and endorsed by the <br />Associated General Contractors of America and the Construction Specifications Institute. 0130B0043 <br />
The URL can be used to link to this page
Your browser does not support the video tag.