Laserfiche WebLink
AGENDA ITEM #9.4.A <br /> city of <br /> Pequot <br /> Lakes! -- <br /> REPORT TO CITY COUNCIL <br /> Report Prepared by: Nancy Malecha & Tim Houle <br /> Date: November 14, 2018 <br /> Subiect: Rasmussen Road Project— Open House Agenda <br /> Re ort: At the October 2nd City Council Meeting, the Council directed Staff to <br /> move forward with scheduling an Open House within the next month or two to <br /> present the Rasmussen Road Study to include the information on costs and how it <br /> will be funded. <br /> The Rasmussen Road Project Open House has been scheduled for November 27, <br /> 2018 at 6:30 p.m. at the Cole Memorial Building. The draft agenda is as follows. <br /> • Introductions <br /> • Need for an Improvement <br /> o WSN will point out the patching pothole on top of pothole in places, <br /> thinking long-term, etc. <br /> • Scope of Study <br /> o WSN will point out committee meetings, figures, and estimated costs — <br /> not a design, not construction drawings, not bidding, not construction. <br /> • Considerations of Committee <br /> o WSN will point out trying to balance drainage, pedestrians, parking, <br /> vehicles, etc. <br /> • Results of Study <br /> o WSN will summarize this with specific maps that will be reviewed later. <br /> • Preliminary Costs <br /> o WSN will summarize the costs north and south, the general groups of <br /> things they consist of, and clarify why the amount changed in the <br /> preliminary levy budget. <br />