My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
06.03 Comprehensive Plan Update
Laserfiche
>
City Council (Permanent)
>
Agenda Packets (Permanent)
>
2018
>
11-14-2018 City Council Meeting
>
06.03 Comprehensive Plan Update
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/9/2018 9:37:16 AM
Creation date
11/9/2018 9:37:13 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
35
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
This approach changed following World War II.The 1950's started the highway era and automobile access became <br /> the predominant design feature for new development. Buildings started to be set back further to provide space for <br /> parking.They were also designed so as to appeal to passing motorists,with pedestrians frequently becoming an <br /> afterthought. New residential and commercial development started to appear on the periphery of town,often <br /> outside ofthe city limits. When the original highwaywas realigned and expanded,the pattern of new growth along <br /> the corridor was auto-oriented. <br /> The area surrounding downtown Pequot Lakes, what was Sibley Township, has developed in a traditional I <br /> rural/recreational pattern. Most of the development was either farmsteads on rural roads or lake cabins. Old � <br /> winding trails to lake cabins have been adapted to one degree or another as local roadways. Most of these are j <br /> substandard in that they lack dedicated public right of way—they exist in a collection of prescriptive easements. <br /> As area development began to pick up in the 1990s,the significant housing investments were transitioning out of I <br /> urban Pequot Lakes to where property owners could have larger acreage and/or direct lake access. Sibley <br /> Township began to transform into its current rural/suburban nature, with suburban-style subdivisions <br /> interspersed throughout lands formerly used for agriculture or logging. Many lake homes were converted from <br /> seasonal cabins to year-round dwellings, with significant increases in property values corresponding with <br /> increases in development intensity. <br /> This is the development pattern that was evolving at the time of the merger between Pequot Lakes and Sibley <br /> Township in 2002,a decision that allowed both entities to plan for the character of the area's growth. � <br /> The fourth incarnation of the original Leech Lake Trail is manifested in the Trunk Highway 371 Expressway which <br /> was completed in 2017,just east of town.Those improvements were in response to increasing traffic counts as <br /> well as safety concerns. <br /> I <br /> i <br /> i <br /> I <br /> Comprehensive Plan Update-November 2018 4 � P a g e <br />
The URL can be used to link to this page
Your browser does not support the video tag.