Laserfiche WebLink
TRANSPORTATION <br /> INTENT <br /> Maintain a transportation system that provides for a variety of safe and flexible mobility options for people <br /> and businesses operating within the City, as well as provides for safe, high-speed access to the surrounding <br /> economic region all at a cost that is financially responsible to taxpayers. <br /> HIGHWAY 371 <br /> The Highway 371 Expressway was completed in 2017 and is located along the easterly border of Downtown <br /> Pequot Lakes.Safety concerns for motorists created the need for this increased roadway corridor.The new <br /> four lane expressway from Nisswa to Jenkins provides enhanced connectivity to more populous areas, while <br /> providing safe and efficient travel to the City of Pequot Lakes for those that visit and work in our community. <br /> Future developments of the Cit�/s road system should capitalize on this new alignment that allows for ease of <br /> access and intra-city travel. <br /> The roads turnback process,between the City,Crow Wing County,and MnDOT for CSAH(Main Street), TH 371 <br /> (Patriot Avenuej,and County Road 112(Rasmussen Road),have allowed the City opportunities to create a more <br /> walkable and bike-able community due to the safer traffic pattern that has emerged in the downtown area.This, <br /> along with the future improvements to Trailside Park,will create a more cohesive community to live,work,and <br /> play. <br /> LOCAL ROADS AND STREETS <br /> The City has had an informal policy of working to bring every road up to meet the Cit�s ofFicial standard.As the � <br /> economy has evolved and the explosive growth of the 1990's and through 2008 has vanished,there is reason to <br /> reconsider this approach. Even in the best of economic times,the City had difficulty keeping up with road and I <br /> street maintenance. With a less vigorous economy projected for some time to come, it does not seem to be <br /> possible that the City could keep every implied road and street maintenance commitment. I <br /> The reality is,however,that the City does not know exactly how much that implied commitment is.While some I <br /> projects that have been in the works for years are continuously delayed for lack of funds (Government � <br /> Drive being the prime example),other urgent projects are added to the near-term list. Many of the roads that <br /> were built by developers or through a direct assessment of petitioning property owners are still in their first life ' <br /> cycle, so major maintenance expense has not been an issue.. In order to greater understand these pending <br /> expenses the City has developed a Street Criteria Policy which provides for the evaluation and rehabilitation <br /> schedule of all of the�ty streets. I, <br /> It is also becoming more apparent that the assumptions behind the current road and street sections may be <br /> faulty,or at least not in line with the public's financial expectations.For roads,it is always assumed that two cars <br /> must be able to meet going in opposite direction at high speed without the need to slow down or yield.While <br /> being able to drive 40 mph instead of 20 mph can save minutes on a trip,this design may be a luxury we are no <br /> longer willing to pay for. <br /> Comprehensive Plan Update-November 2018 24 � P a g e <br />