My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3(a) Variance to Construct Guest Quarters on an Undersized Lot
Laserfiche
>
Planning & Zoning
>
Agenda Packets
>
2018
>
10-18-2018 Planning Commission Meeting
>
3(a) Variance to Construct Guest Quarters on an Undersized Lot
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/12/2018 11:02:23 AM
Creation date
10/12/2018 11:02:21 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Accessory Structure Size—square feet, 1,280 1,280 1,280 <br /> maximum,cumulative <br /> Building above highest l�own groundwater or 3 3 3 <br /> lake level—feet,minimum <br /> Maximum Density 1 unit/20,000 sq.ft. 1 unid40,000 sq.ft. 1 unid80,000 sq.ft. <br /> ISTS setback from OHW—feet,min;mum 75 75 100 <br /> 4. Performance Standazds. The following performance standards apply to all <br /> development in this zone: <br /> A. Guest Quarters. A dwelling guest quarters must meet the <br /> following restrictions: <br /> (1) Shall be located along with the principal structure on the <br /> smallest lot meeting the above requirements. <br /> (2) Shall not cover more than 700 square feet of land and must <br /> not exceed 15 foot height. <br /> (3) Shall be located to reduce its visibility as viewed from <br /> public waters and adjacent shorelands. <br /> (4) Shall be screened from adjacent parcels and public waters <br /> by vegetation,topographical location, increased setback, <br /> color or other methods assuming summer leaf on <br /> conditions. <br /> B. Impervious Covera�e. Impervious coverage may be increased by <br /> 5%through a conditional use permit if the following is provided: <br /> (1) A storm water retention plan showing containment of the 5- <br /> year, 24-hour storm event on the pazcel. <br /> (2) Direct runoff of stormwater to adjacent water bodies, <br /> including wetlands and adjacent parcels, shall be eliminated <br /> through the use of berms or other permanent means. <br /> C. Setback from OHW. On parcels with municipal sanitary sewer <br /> service, if a structure exists on either side of a proposed structure, <br /> the waterfront setback may be altered without variance to conform <br /> to the adjoining setbacks provided that the building site is not in a <br /> bluff impact zone or the setback less than 50 feet minimum. If no <br /> structure exists on either side, a new structure may encroach up to <br /> a 50-foot setback from the OHW. <br /> D. Stairways, lifts and landin�s. Stairways and lifts are the preferred <br /> alternative to major topographic alterations for achieving access up <br /> Pequot Lakes Staff Report 3(a)-g <br /> October i8,2oi8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.