My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10.02A - Change Orders for West Lake St Proj
Laserfiche
>
City Council (Permanent)
>
Agenda Packets (Permanent)
>
2010
>
08-03-2010 Council Meeting
>
10.02A - Change Orders for West Lake St Proj
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/28/2014 9:48:47 AM
Creation date
4/28/2014 9:47:26 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Change Order <br />No. 1 <br />Date of Issuance: July 19, 2010 Effective Date: July 19, 2010 <br />Project: 2010 West Lake Street Owner: City of Pequot Lakes Owner's Contract No.: N/A <br />Improvements <br />Contract: Roadway Grading, Paving, and Drainage Improvements Date of Contract: <br />Contractor: DeChantal Excavating, Inc. Engineer's Project No.: 0130B0043 <br />The Contract Documents are modified as follows upon execution of this Change Order: <br />Description: Change sidewalk width from 10' to 8' and estimated sidewalk quantity from 6,048 sq. ft. to 4,838 sq. ft. (- $2,698.30) <br />Add ditch check in TH 371 ditch south of Oasis entrance ( +$700) <br />Add insulation over sanitary sewer 40' long x 4' wide at east end of existing installation ( +$1,240) <br />Attachments: None <br />CHANGE IN CONTRACT PRICE: CHANGE IN CONTRACT TIMES: <br />Original Contract Price: Original Contract Times: ❑ Working days X Calendar days <br />Substantial completion (days or date): August 27. 2010 <br />$ 149.233.43 Ready for final payment (days or date): September 24. 2010 <br />[Increase] [Decrease] from previously approved Change [Increase] [Decrease] from previously approved Change Orders <br />Orders No. to No. No. - to No. - <br />Substantial completion (days): <br />$ N/A Ready for final payment (days): <br />Contract Price prior to this Change Order: Contract Times prior to this Change Order: <br />Substantial completion (date): August 27. 2010 <br />$ 149 233.43 Ready for final payment (date): September 24. 2010 <br />[Increase] [Decrease] of this Change Order: [Increase] [Decrease] of this Change Order: <br />Substantial completion (date): None <br />$ (758.30) Ready for final payment (date): None <br />Contract Price incorporating this Change Order: Contract Times with all approved Change Orders: <br />Substantial completion (date): August 27 2010 <br />$ 148 475.13 Ready for final payment (date): September 24, 2010 <br />RECOMMENDED: <br />By: [� ) <br />Engineer (Authorized Signature) <br />Date: ` r <br />Approved by Funding Agency (if applicable): <br />ACCEPTED: <br />By: <br />Date: <br />Owner (Authorized Signature) <br />ACCEPTED: <br />By: <br />Con ctor (Authorized Signature) <br />Date: 7 <br />Date: <br />EJCDC No. C -941 (2002 Edition) Page 1 of 1 <br />Prepared by the Engineers' Joint Contract Documents Committee and endorsed by the <br />Associated General Contractors of America and the Construction Specifications Institute. 0130B0043 <br />
The URL can be used to link to this page
Your browser does not support the video tag.