My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
08.01 - e-Charging Resolution/Joint Powers Agreement
Laserfiche
>
City Council (Permanent)
>
Agenda Packets (Permanent)
>
2010
>
08-03-2010 Council Meeting
>
08.01 - e-Charging Resolution/Joint Powers Agreement
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/28/2014 9:48:18 AM
Creation date
4/28/2014 9:47:24 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
1-� <br />Wastewater Dept. <br />I. Facility Performance: <br />a. CBOD Concentration <br />Influent — 311 mg/1 (No Design Listed) <br />Effluent — mg/1 <br />b. TSS Concentration <br />Influent — 286 mg/1 (No Design Listed) <br />Effluent — mg/1 <br />c. Effluent Fecal Coliform — 4 <br />Permit Condition — 200 organisms /100 ml <br />d. Flow - Average Daily Flow — 55,000 gallons <br />Maximum Daily Flow — 73,000 gallons <br />Minimum Daily Flow — 44,000 gallons <br />Total Monthly Flow — 1,698,000 gallons <br />II. Operations and Maintenance: <br />(Design — 121,795 gal/day) <br />• The monthly MPCA Discharge Monitoring Report was completed and submitted. <br />• July 2nd, helped Street Dept. with traffic control and tree removal on W. Lake Street. <br />• July 3rd, there was a lengthy power outage. Scott and I brought generator to main lift <br />station to run the pumps, but the generator wouldn't run so I had to call Fyle's to pump <br />the station. Our generator is a 1956 model and we really should look into having it <br />replaced. <br />• July 12th brought east irrigator pipe to Steve Weagel to have repaired. <br />• July 28th-30th, attended MWOA Annual Conference in Grand Rapids. Was nominated <br />for the Class C Outstanding Operator Award, how nice! <br />*Took vacation days: July 6th-9th, 23" and 27th* <br />Report Submitted By: Tina Nolden (Water/Wastewater Operator) <br />Please call me if you have any questions /comments. <br />218 -568 -5604 or 218 - 820 -2125 <br />
The URL can be used to link to this page
Your browser does not support the video tag.