My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
09.04 Rasmussen Road Study Update
Laserfiche
>
City Council (Permanent)
>
Agenda Packets (Permanent)
>
2018
>
10-02-2018 City Council Meeting
>
09.04 Rasmussen Road Study Update
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/27/2018 11:49:04 AM
Creation date
9/27/2018 11:49:02 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
AGENDA ITEM #9.4 <br /> city of <br /> Pequat <br /> Lakes= <br /> REPORT TO CITY COUNCIL <br /> Report Prepared by: Tim Houle <br /> Date: October 2, 2018 � <br /> � <br /> Subiect: Rasmussen Road Study Update ', <br /> Report: The Rasmussen Road Study is complete. After consultation with the <br /> Subcommittee the Council appointed, WSN has provide figures showing the I <br /> proposed roadway and storm drainage improvements as well as cost estimate splits ' <br /> between north of Main Street and south of Main Street. <br /> The estimated cost of construction and soft costs (engineering, contingencies, R/W <br /> acquisition, etc.) for the segment north of Main Street is about $1.84 million. The I <br /> estimated cost of construction and soft costs for the segment south of Main Street <br /> is about $1.86 million. <br /> We understand the City Council may be looking at an open house as a next step. <br /> Council Action Requested: Council directive on adjustments to the Rasmussen �I� <br /> Road Study and the scheduling of an open house to gather further input. , <br />
The URL can be used to link to this page
Your browser does not support the video tag.